COOT REPOST - PROJECTS 1) PROGRESS
AS GF JUNE 30, 1921
_
COSTS INCURRED
_
CUMULATIVE - TO DATE
Description
Tote]
as
48,967.15
»091.2
598 , 834 .60
15,043. 31
atk
Fa
177, 448. 34
30,516,453
22,756.85
1,839.16
30,483.19
9,210.56
530,437 be
115,306.54
248,284 41
6,150.96
119,393.58
34,808.78
Fuel facilities
.
Electrica] facilities
Telephone submarine cable
Telephone facilities
Ccotrcol & signal system (included in
182,121.74
OG ,TT9.91
837,103.43
67,733.59
52,997.54
75 ,BF2 2h
167,080.79
12,140.56
54 461.04
206 , 484.23
430,770.50
36,995 .67
3,047.14
4,802 48
13,976.76
-
52,453.39
80,645.15
174,836.95
12,851.24
15,727.25
23,203.22
50,438.41
3,664 .99
by Military)
Public Addresa system
Purniture for all buildings
Equipment for all buildings
1€ ,689.%°
840.38
L&6 912.74
498,154.40
6,385.56
12,633.35
31,074.71
114,203.45
411,423.49
158, 364.77
€1,509.59
17,382.27
459,765.65
29,897 234
58,278.28
134,7C7.82
19,154.23
23,797.83
139,417.12
5,806.57
10.50
4,555.28
She TA
3,967.83
135,591.48
10,109.07
23,318.03
$ 6,459,120,.22
$1,597,0€8.03
$2,728,159.38
$145,798.56
$1,537,161.19
§$
$
¢$
$
§$
Re
Aluminum buildings
Frame etc rage vault
1,727.98
ae
Tents, {ocluding slab
127,786.55
Sever facilities
108,43h 4b
ee N
Water facilities
Bogullua estimate)
Radio back-up system (Equipment furnished
Rehabilitation of existing varehouses
Inftial rehabilitation
C.M.R. Area Facilities
Undergrcund Shelter Ares
Miscellaneous Structures & Facilities
{b)
TOTAL
ENIWETOK ISLAND - BUILDINGS & FACILITIES
Blading & shaping
(Reads)
$
(Site Prep.)
Dugt palliative
{Asphalt Roads)
Modification of runway {Runway Shift & Surfacing)
1}
(2)
‘L)
2)
Plane parking areas
Air Porce Living Camp, Aluminum Bidgs.
Tents, including slab
Army Living Camp, Aluminum Bidgs.
Tents, including slab
Aluminum Bligs., Army Service Center
(c)
-
3,008. 40g
1,068, 81
197.39
129.95
46 98°. 40
60,957.23
4700.72
17,571.20
23,368.35
171,170.4
73,465.75
93,067.27
40,908 49
6,029.23
242.99
136.54
E43, 54
59.40
112,1¢5.04
-
51,418.05
9, 308.46
1£1,124.463
79,599. 8h
RF, 322.05
39,450.06
(1) Aluminum Bldgs., Common Services
}) Tents, including slab
Aluminum Bldge., Air Force Operational
997 , 367.85
54,524 63
182,854.99
162,611.59
448,32
1,841.12
154.07
152,172.23
Bldgs. & Power Houses
POL Facilities - On Shure
POL submarine lines
Electrical Generation Facilities
Blectrical Distribution Facilities
Telephcne Facilities
79,41. .69
95,410.42
19,773.27
238,925.07
223,857.55
164,287 4d
15,403.36
159.63
3,288.9¢
26,981.78
55,127.75
1,810.11
42,199.60
82,651.83
11,967.98
168,216 82
82,446.20
154,919.07
Aluminum Bldgs., Transmitter & Receiver
)
¢)
‘l)
}
VV
Gaaeee
De 241 dttan
109,974 LA
22,499.36
1,994.67
32,320.38
17,193.00
599, 04 £8
51,639.66
1€8,660.06
188 .62
60,717.75
50,416.92
-
20.51
23.59
a
-
7,024.86
2,538.61
§
Cost
156.11
117.55
eo RT
12,71
1,715
5,494.15
652,479
4,335.28
12,782.00
2,081.13
24,970
SED
1,256,306
75,979
9,731.70
4 999. 36
96,625
130,465
-
tion to Date
i
100.0
100.0
10¢.9
100.9
100.0
100.0
106.0
100.0
100.0
100.0
100.0
100.0
100.0
100.6
*
-
1,927.67
3,813.76
9,381.45
2,119.99
AAG, 3f
972.0
5,336.01
13,095
1,085
101,275
Te, 420
100.0
100.0
100.0
100.0
18,568.54
-
1066, X9
100.0
474.53
-
109,255
-
-
-
4,827.25
Loe .51
-
451,935.49
§ 87,997.57
# €,254,735
100.0
¢
$
29,039
100.¢
32,250
132,440
100.6
100.0
32.42
36.21
787.50
771.51
6,185.49
4, 346.79
1,907.25
2,857.43
1,064, 07
1,820.12
732.36
32.17
194 27
17.90
5,382.71
719.95
=, 999.08
403,16
6,792 .20
46.51
773.96
R58 03
3,272.50
4, B4C , 33
345,140 #*
2T , 395
Loi 246
100.0
40,665.65
3,068.35
7,184.09
1,419.05
_§, 304.52
2,756.34
47, 2b9
106,030
Percentage of
Physical Comple-
12,775
137,720 (a)
1,995,100
21 AB
8,973.19
5,867.34
17,221 .bh
23,362.44
$
(4
125.96
3,047.53
15,307.98
-
1,462.71
e
na jis?
3,845.72
29,654 12
-
6.63
1,893.95
2,918.0h
Estimutea
Design
130.45
-
6,256.74
~
15,292.18
40,938.11
9,398.81
-
$
32,191.38
-
28,308.79
8,263.37
12,301.54
5,852.18
~
-
22,850.72
438.65
24 ko
-
52,708.75
$
114 oe
23,412.87
>
-
5,138.53
93,304.74
32 ,23€ .95
158 611.70
917.15
590.76
19,095.15
-
Piers
Asphalt. surfacing
432,19
94 GbE. 35
Refriveration plant
° 40g, 32
g
Operation
oO.078 3h
59,949.21
30,257 he
158,%3.25
258 ,f72.99
2,300, RA, FT
(c}
F377
Indirect
Tetal
Engineering
ES
5anph. BT
DOT. 35
885 , 894. 2k
(Site Prep.)
26, oF 96
$B
Usage
eT
4g, 832.0
€2,511.71
5P7 , 899.97
(Airstrip)
73,971.99
Material
Th
Camp
$217,957.91
Dust peiliative
£
Equipment
2,315.33
Asphult surfzc ing
(Roads)
Direct
Labor
“Gy
PARRY ISLAND - BUILDINGS & FACILITIES
Blading&shaping
Direct
7,115
T7EAES fa)
109.9
100,0
100.9
100.0
100.0
31,705
197,175
OR hS
LO? 755
54,295
100.¢
100.0
100.0
100.0
100.0
100.0
160,06
100.0
131,c4¢
38.99
”
174,547.18
1,756.18
6,105.21
4g 089.25
135.34
555.79
11,917.06
25.13
5,591.92
TEE 5
Ti,eo
226,855
713.86
273.58
1,354.88
-
16,170.58
2,415.95
3,528, 54
32,693.75
56,121.56
cower y=
4 650,13
4816
992.85
8,7k9. 04
16,543.99
.
753.55
4,133.95
10,155.12
Ba, 4a5
129,445
36,936
313,915
ony Aan
100.0
100,0
100.0
10 .0
100.0
tee