TO: D. J. Brush, General Manager LD ba pete, W. M. Munk, Manager, Operations SUBJECT: TRIP REPORT, MISSION NO. 4 - DOE/DNA/CHARTER VESSEL LIKTANUR IT Enclosures: =: *, FROM: 1. ° Three statements from Dr. Pratt.. 2. 3. Final Medical Team Manifest ~~ T.A. for two patients - Kwad to Rongelap This report will consist of a daily chronology, fol lowed by observations and comments. we ~*~ Wednesday, 23 May. ., Arrived Kwajalein 1130 and met by Dr. Pratt and Jim Watt. We went ~~, immediately to Liktanur and made a 15 minute tour of the vessel. This was Dr. Pratt's first visit aboard since his arrival for this mission. ‘He had no specific comment except to say "looks fine". \ » Received word of the death of Keith Coberly's father, in an automobile accident. Keith, the new master of the vessel, contacted his sister by phone - and stated he would go on the mission. Received word from Jim Watt that four boxes of medical gear, loaded on Air Mic at Majuro, were not offloaded at Kwajalein but went on to Guam. Next Air Mic flight from Guam arrives 1630 on Friday. Jim to make effort to ensure Continental has the boxes on the Friday flight. Thursday, 24 May. sleeping quarters, proved unsatisfactory. Mr. Jan Kocian purchased 12 flashlights, 24 batteries and 12 bicycle flashlight clamps, which were intalled on the bunks. 1100 hrs. Global has had the two 17 ft. DOE whalers for four weeks for repairs - but still have not touched them. . Marine Department. ‘ 7 Mf Individual reading lamps, ordered one for each bunk in the medical team's | Will discuss with Global Afternoon - Received word from Jim Watt that Dr. Pratt had called and wanted to talk to me. regarding a request from Larry Edwards for two Rongelapese passengers to go from Kwajalein to Rongelap, and how much was the fare? . awouisoaad w30704 . ar | ole dune 11, 1979 ACY2OF 70 DATE: 4 nevabou/ 22107 PACIFIC TEST DIVISION CONTRACT EY-76-C-08-0020 oN XO@ eg o/NOWOSTION , AW FOR HOLMES & NARVER, INC. ENGINEERS -— CONSTRUCTORS.