TO:

D. J. Brush, General Manager
LD ba pete,
W. M. Munk, Manager, Operations

SUBJECT:

TRIP REPORT, MISSION NO. 4 - DOE/DNA/CHARTER VESSEL LIKTANUR IT

Enclosures:

=:

*,

FROM:

1. ° Three statements from Dr. Pratt..

2.
3.

Final Medical Team Manifest ~~
T.A. for two patients - Kwad to Rongelap

This report will consist of a daily chronology, fol lowed by observations
and comments.
we
~*~

Wednesday, 23 May.
.,
Arrived Kwajalein 1130 and met by Dr. Pratt and Jim Watt. We went ~~,
immediately to Liktanur and made a 15 minute tour of the vessel. This
was Dr. Pratt's first visit aboard since his arrival for this mission.

‘He had no specific comment except to say "looks fine".

\

»

Received word of the death of Keith Coberly's father, in an automobile
accident. Keith, the new master of the vessel, contacted his sister
by phone - and stated he would go on the mission.
Received word from Jim Watt that four boxes of medical gear, loaded

on Air Mic at Majuro, were not offloaded at Kwajalein but went on to

Guam.

Next Air Mic flight from Guam arrives 1630 on Friday.

Jim to

make effort to ensure Continental has the boxes on the Friday flight.

Thursday, 24 May.

sleeping quarters, proved unsatisfactory.

Mr. Jan Kocian purchased 12

flashlights, 24 batteries and 12 bicycle flashlight clamps, which were
intalled on the bunks.
1100 hrs. Global has had the two 17 ft. DOE whalers for four weeks

for repairs - but still have not touched them.

. Marine Department.

‘ 7

Mf

Individual reading lamps, ordered one for each bunk in the medical team's |

Will discuss with Global

Afternoon - Received word from Jim Watt that Dr. Pratt had called and
wanted to talk to me. regarding a request from Larry Edwards for two
Rongelapese passengers to go from Kwajalein to Rongelap, and how
much was the fare?
.

awouisoaad

w30704

.

ar

|

ole

dune 11, 1979

ACY2OF

70

DATE:

4

nevabou/ 22107

PACIFIC TEST DIVISION
CONTRACT EY-76-C-08-0020

oN XO@

eg
o/NOWOSTION
,
AW FOR

HOLMES & NARVER, INC.

ENGINEERS -— CONSTRUCTORS.

Select target paragraph3