CHAPTER If, SECTIONS 1-1A
Aeld inspectors to the greatest extent possible.

rhe weekly progress report detailed activity
‘n open construction work orders which reached

a maximum number of 337 on the Eniwetok
Atoll and 339 on the Bikini Atoll for a total
of 676.

SECTION IA
SURVEYS
Surveys by Holmes & Narver at the Pacific
Proving Ground were initiated at Eniwetok
Atoll in February 1949 with the topographic
mapping of project islands for design purposes.
As additional personnel arrived, the activities
of the department expanded to include a hor-

Atoll. This scheme was expanded in 1951 and
1952 to include the entire Atoll and consisted
of primary network of second order triangulation stations supplemented with third order
stations at locations of lesser importance. Test

hydrography, construction layout, and special
surveys to satisfy scientific requirements and to

required, by
tions of the
are included
ERATIONS

izontal control network, additional topography,
provide assistance to Users. Surveys at Eniwe-

tok

were a continuation and expansion

of

these activities to fit the special needs of three

test operations.

With the expansion of the PPG to include
Bikini Atoll, a survey program was initiated in

this area following the same general pattern of

surveys previously performed in the Eniwetok
Atoll area. The majority of the survey personnel
were

stationed

at

Bikini

Atoll

during

the

CASTLE program with a maximum of six field
parties and supporting office personnel. The
smaller program at Eniwetok Atoll was served
by two field parties with some transfer of personnel between areas to meet peak work loads.

The sequence of surveys at both areas was
dependant on priorities for the services of the
department. As construction layout proceeded
simultaneously with design and control surveys,
it was not possible to follow the normal procedure of first establishing horizontal and

vertical control and then proceeding in sequence
through design surveys and construction layout.

This condition did not permit maximum efficien-

cy in performing the design and control surveys,

but as construction layout was kept on a current
basis at all times, the procedures used were just-

ified. The earlier surveys were covered in detail
in reports of OPERATIONS GREENHOUSE
and IVY, and the following is primarily a description of survey activities at Bikini Atoll through the CASTLE program. In view of the recoverability of the work and its probable future
value in any use of the area, however, sufficient

sistorical summaryis given to evaluate its cartgraphic significance.

HORIZONTAL CONTROL — ENIWETOK
ATOLL
_A horizontal control scheme was establish-

ed in 1949-50 covering the eastern portion of the
Page 2-6

operations destroyed some of the original
stations and new stations were established, as

expansion from the remaining pornetwork. Records of these surveys
in the completion reports for OPGREENHOUSEand IVY.

PREVIOUS SURVEYS. A study of previous
surveys within the Atoll was made and some
features of these surveys were utilized in establishing the scheme. Theavailable records of these
surveys are included in “The Report of the Engineer, Joint Task Force SEVEN, Part 2,” dated
1948.

The earliest survey was completed in 1944
by the USS Bowditch to control the hydro-

graphic mapping of the Atoll. This survey was
of third order accuracy, and as most of the stat-

ions were not on project islands it was not adaptable to requirements of this project. However, the Bowditch geographic position of Station North Base on Runit Island and the azimuth of the line Station North Base-Station
Sand becamethe origin of position and azimuth
for the later surveys.
A survey was completed in 1947-48 by
Joint Task Force SEVEN, consisting of a limited scheme covering the eastern portion of the
Atoll. The scheme was reported to be of first
order accuracy but it was only because of its
limited extent that it could be considered to be
of such high order. As the south end of the original (USS Bowditch) base line had been destroyed, a new base line, North Base-Runit, was

established and the azimuth of this line was
computed from its relation to the line North
Base-Sand. Expansion of this scheme involved
re-occupation of all of its existing stations and
it became obvious that to meet project require-

ments, a substantially new and stronger scheme
was necessary which could be expanded as required.
1949-50 HORIZONTAL CONTROL SURVEY.
This scheme was designed to meet the control
requirements of OPERATION GREENHOUSEand to be adaptable to future expan-

Select target paragraph3