CHAPTER II, SECTION 4
Additional parking apron, Fred.
Modification of Building 90, Fred.
Sleeve antennas, transmitting station, Fred.
Antenna joint transmitting station, Fred.

Laboratory and administration spaces for
TG 7.1, Fred.
Communication facilities, Buildings 164
and 221, Elmer.

Ice Block tanks, Elmer.
Remodel Building 120, Elmer.
Refrigeration project, Fred.
Comunication facilities, Buildings 89, 638
and 90, Fred.
Recreation facilities for TG 7.3, David.
Of particular interest in the foregoing work
was the planning and implementation of Projects for TG 7.1 administration - laboratory
spaces and for the weather stations.
_

Ineary October 1955, criteria were first re-

ceived for space requirements of TG 7.1 on Fred.

The proposal then submitted to the Contractor
called for the construction of three buildings

Figure 2-177.
Page 2-198

with a total of 10,500 square feet and the rehabilitation of Buildings 633, 634, 635, 636, and 640
with an additional power supply from portable
generators in view of the critical power situation.
at Fred. Completion of this project was requested by 1 March 1956. To meet this date the
design was based on materials that could be
procured on acceptable dates. Final authorization for the construction of Buildings 686 and
687, and the rehabilitation of Buildings 633,
634, 635, 636, and 640 was received on 26
January, at which time a completion date of
15 March was requested. At that time, the Contractor was informed that in lieu of Contractorfurnished generators, four 60 KW Governmentfurnished generators would be forthcoming to
provide power for Buildings 633, 634, and 635
and that power for the other buildings would
be provided from the island system. Completion

could not be met by the requested date of 15

March because of the late receipt of electrical
items and someof the dehumidifying equipment
resulting primarily from the late firming of requirements for this project. About 22 March
the project was only 57 per cent complete;
approximately one-third of the space was made
available to the users. Through a concentrated
effort, this project was, for all practical purposes,
completed on 21 April 1956, with progress reported at 97 per cent.