PeeS

ae

CHAPTER II, SECTION 3

Figure 2-112.
tower

at

levels

of

25,

150,

175,

200,

225’, 262.5, 275’ and 287.5’. User-furnished
fluors and power receptacles were installed on
four of the platforms. The User-furnished and
installed a mirror at the 200-foot level. Plywood
panels 8’ x 8’ painted black were erected in back
of the fluors and mirror. Access to each plat-

form was provided through the elevator and a
ladder. Electrical power was supplied by the
island system via a panel located in the tower
cab.

STATION:
PURPOSE:
SITE:
USER:

3010
Fireball Study
Tilda
DOD-30

PARTICIPATION: 1 and 2
CONSTRUCTION: 1-18-56/5-1-56

Station 3010 was a reinforced concrete
structure ‘5’ x 6’ x 7’ high, inside dimensions. The
building was covered with earth over the roof
except at the front and rear walls. The rear
wall contained viewing ports which were oriented
on the Stations 1 and 2 cabs. The User furnished
a 3% KW generator. Minus 45 minutes and
minus 1 second timing signals were required. A
total of 60 cubic yards of concrete was poured
for this station.

Station 2320 Series

STATION:
PURPOSE:
SITE:
USER:
PARTICIPATION:
CONSTRUCTION:

3011
Fireball Study
Sally
DOD-30
1
11-8-55/4-30-56

This station consisted of a 12-inch diameter

schedule 160 steel pipe extending from the base

of a steel recording shelter to a point 10 feet
from the underside of the Station 1 cab floor.
The steel shelter was embedded in a 24’ x 24’ x
11’-thick concrete slab which provided footings
for the tower and an elevator pit for Station 1.
The pipe contained 15 instrument gages along
its length. The instruments were wired to a
recorder in the steel shelter at the tower base.
Grout was required inside the pipe and the
conduit carrying the instrument wiring was
filled with insulating material. Steel access platforms were installed at seven locations along the
pipes. A 25’x 25’ area of rock 2 feet deep was
placed over the top of the shelter to deflect
and absorb blast waves. No power was required.
Minus 1 minute and minus 15 seconds timing
signals were furnished.
Page 2-119

Select target paragraph3