Az 5.1.2 Off-Load Extra Test Aircraft Tuo test aircraft will be off-loaded from both Transit ABLE and BAKER and transported to Eniwetok for stowage. (Sec Tab C-19 for aircraft off-loading plen.) Tho aircreft which is installed on #5 hatch will be left on the ship for the first tost, 5.2 Dry Runs and Shot Rohoargels (Sce Tab C-18 for scheduls) 5.2.1 Off Losding of Aircraft The procedure for off-loading the aircraft aftor R-hour will te checked out, (Sce Tab C-19,) 5.2.2 Decontamination of Aircreft Using o test aircraft spotted in the propor location in the decontaminetion strip, the monitors will practice their initial monitoring operation, Decontamination equipment will be moved into position and the stepwise decontaminetion operation vi11 bo simulated. Thesc operctions will be used to train Teem © when they aro cvailable, 5.3 Typicr] Shot Schedule 5.3.1 Operstions Prior to H-Hour None, 5.3.2 training, Operstions Between H and R Hour (Sec Tab C~18 for Schedule.) 5.3.2.1 Make final check on 11 equipment, 54322.2 Organize decontamination crews end complete 5.3.2.3 Contact 6.4d, 6.4f ond 6.4g and complete arrangements for instruments anc services, 5.3.2.4 Chock arrangements vith J6 for ccuipment end personnel to off-losd the aircraft, transport it to the freight pier and tow it to the decontemination strip. ST. LOUiS FEC 5.3.2.5 6.4c reprosentative proceed to Transit ABLE and BAKER with berge for the offelonding of aircraft, il ZO