5.3.3

Operations after R-Hour (See Tab C-18 for schodulc.)
5.30301

Off-lond aircraft from transit ship to LSU

using tiinch and boom on ATF-106,

Remove gamma detector from cockpit

and #5 hatch (os in 4.7.6). Scheduled time of off-loading efter R-Hour

to be coordinated with Projoct 6.44 and J6,
5.3.3.2

et Enivetok vith circreft,

ISU with eircraft procced to froight dock

Unload aircrcft end attach towing gear,

Tow the aircraft to the dccontamination strip,

(Oporations porformed

5.3.3.3 Sot up gamma detoctors in cockpit and immedintcly
forvierd of the wing, Proceed with monitoring, inspections and steptise
decontamination, Monitors will be required (as noted in 4.7.6), equipped
with beta, gamme, directional gamma instruments and wipe sampling equip=nent,
5.4

Botween-Shot Preperation (See Tab C-18 for schedulc)
5.4.1

After the decontcmination operations have been complcted,

all equipment will be checkcd and repaired as necessary.

5.42 When processed monitoring data is available from the
first shot, it will be studied to determino itS adequacy and the efficiconcy
of the washdomm system, Hot spots will be locrtcd and the washdom systen
will be modifiod if the weshing action can bo improved, Pipe evcilable
from the ship's stores will be used for this vork and it will be accomplish-~
ed in conjunction with Project 6.44,
5.4.3 Two test aircraft for next shot will be transported
from Eniwetok Island to Transit ABLE and BAKER and loaded on #5 hatch,

(See Tab C-19 for details.)

5e4-4 All operations and procedures will be carefully checked
and improved where possible,

5.5

Roll-Up

Schedule (See basic plan and Tab C-1€ for schedule)

50501 Packing

ST. LOUIS FRC

When all decontamination is completed, the equipment
and tools will be cleaned and repaired as necessary and packed for shipment.
12

4