ey
4.7.3 Ytilities
See Tab C-14,
4.7.4

Gr

Water

n

t

ent Movement

See Tab C14,

4.7.5 Photography
See Tab C-14,

4.7.6

Special Services
See Tab C-l4, .

4.8

Requirements
See Tab C-15 for personnel lists and schedules,

4.9

Shipping and Transportation Requirements
Sea and air shipment requirements for matcrials, test samples

and personnel to and from test area ere shown in Tab C-16,
4.10

Costs

See Tab C-17 for breakdowm of budget and record of expenditures,

5.

COMMEND AND COMMUNICATIONS MATTERS (Tust Operations)

General operational matters are as given in the basic plan,
is shot-time, R-ehour is reboarding time on a particular ship,
5.1

H-hour

Pre-Shot Prepsration (See Tab C-18 for details and schedule)
5.11

ST, LOUISF;

On-Site Equipment Chock end Calibration

SFRC

Water lines will be connected to the cleening unit and
sufficient operation of the unit will be conducted to determine its performance, Booster pumps will be added as neccessary to give the required
water pressure, Other items of ecuipment including water hoses and pumps
will be tested for proper performance, The aircraft engines will be run
up periodically, The radio equipment will be checked for proper operation
after the aircraft has been loaded on the ship.
10

69

Select target paragraph3