£.10 Costs See Tab H5. 5. COMMAND AND COMJUNICATIOUS MATTERS (Test Operations) General operational matters are as given in the basic plan. is shot time. R-hour is reboarding time on a particular ship. 5el d-hour Pre-Shot Preparation. None 5e2 Dry Runs and Shot Rehearsals None 5 Typical Shot Schedules 5e3el1 Operations Prior to H-Hour None 5.3.22 Operations Between H and R-Hour Sedeleol Contact 6.4 a, d, f, and g and complete arrange- ments for instruments and services. 50363 Operations After R-Hour Retrieve dosimeters. 5.4 Proceed with monitoring. Between Shot Preparation Install dosimeters as late as possible to minimize dosage from residual contamination. 565 Roll-up Schedule 525.1 All records and classified material will be cleared through the appropriate channels and prepared for transmittal to USNRDL. 5.6 Communications and Timing Links As in basic plan. 5.7? No special requirements not covered by Annex F. Report Schedule ST, LOUIS FEC a be The final report shovld be completed within six months after personnel return to USNRDL. 6 | Jo 7