4.2 Pre-Test Work on Transit Able and Baker at USWRDL None 4.3 Post-Test Work on Transit Able and Baker None 44 Post-Test Work at USNRDL 4.4.1 Post-Test Experimental Work None 4.4.2 Data Reduction The data obtained from the gamma recording instruments will be presented as a log-log plot by Project 6.4f. will be reduced at test site. 4.4.5 to this annex. information. 4.5 Some of the data Report Writing Report information will be ke pt current by means of tabs Preliminary report will be written in field from this Final report will be written upon return to USNRDL. Equipment Requirements None 4.6 Instrument Requirements 4.6.1 See Tad Hl for details of location and instrument requirements for ionization chambers with continuous recorders. 4.6.2 See Tab Hl for details of location and instrument requirements for integrating dosimeters. 4.6.53 4.7 See Tab H2 for details of radiation field surveys. SupvortingServices Required at Site see Tab H4. 4.8 Mannower Requirements ST, LOUIS FRC See Tab H5. 4.9 Shipping and Transvortatioh Requirements None. 5 i . y S26