TRANSIT BLUE BOOK ANNEX I AIR MONITORING STUDIES Task Organization Group Leader =< B. H. Carder Teams Manpower A = Technical B. M. Carder B = Support One enlisted man (standby) for possible duty in removing air monitoring data. 1. GENIR«AL SITUATION 1.1 General Same as in basic plan. 1.2 Wature and Scope of Test This test will be conducted to provide informatian on possible concentrations of airborne beta decay products that would create shipboard inhalation problems. A prototype instrument that is expected to fit design specifications of a possible future shipboard air monitoring unit will be placed on each TRANSIT ABLE and TRANSIT BAKER in an effort to answer questions concerning the necessity for an air monitoring system and the effectiveness of the prototype instruments in providing such warn- ing as may be needed. In other words, does an actual airborne hazard exist, and will these instruments adequately record such hazard and give warning in time for realistic countermeasures to be taken? 1.5 Purpose of Annex 1.3.1 Todescribe in detail the experimental objectives and plan of attack on Problem 6.4i. ST, }Le Gis x ~ 1.3.2 To provide detailed information on the operational and lo:istic requirements of Froblem 6.4i. 1.4 Enemy Forces Same as basic plan. 1.5 Friendly Forces 1.5.1 Same as basic plan. CIGL- GLS- CYS IPY Pad 2 -€05-35 (74-0$Y. LDS- 3 V5