.

abo~

32,000 lbe. eaoh and 20S 48-in ~ela weighing about 2,300

I
I

lbs.

eaoh.
3. The fOllmdW

~terial and equi-nt

till ~

cable station for oonstruotionof reel s*do,

req~~d

at t~

blooking, shoring, eto.,

with a SUpply of spikes and bolts for assembling the stands.
(a) Lumber

‘1
I
I

(A list Of SiZOS and amounts)
lift of eight tone for

● mlnim~
.
the handling of cable reels. This mane will be uead at leaet every

(b) One mobile o-e

with

often oontinue over 24

two hours during loading operation whioh my

hours. It is therefore ● primary requisite for the shore station.
It will also be neoessary fbr the unloadlng of cargo boats,when the

I

oable is plaoed ashore. It is suggested the following item or one
of similar design be supplied for this purpose:
Crane, remlving, truok,

mounted, pneunatio ~-engine

drive, 8 to 12 ton, Close XX, @

%ook No. 78-2831.000-000

(e) One Weapone Carrier (four wheel vartety suffloient)
should be assigned the cable station for general utility use.
(d) One radio equipped jeep (SCR-608) should be provided
both for utility use of the oable station and for reliable and readily
available oommunioationefor transportationto any of the @even uhore
ends of the cablea*
(e) *O

tool and 6upply6hOd (lighted)approxinwteiy 16’
4

by 3ot tith shelves and a ~rk

~rloh Should ~

b~lt ●t t~

able

I
I
I
I
I
I
I

atationo
(f) For oonetruotion of light rain-proof shelters:
22
Seation XI

I

Select target paragraph3