(e) Furnish 10 snatohblookswith sheaves not le6s than 15
Inohea in dizmeter with auffioient clearance to pass splioea 3 inohes
in diameter without binding. Blocks to be equipped with swivels and
6hackle6 for attaching the blookz to @OyO@.
3.

The followingmaterial should be procured and plaoed on board

the LSM et the yard whioh it Is fitted out as a sable shipf
(A list of supplies including variouz taokle, pit
logs, navigational equipment, s~cial dunnage
lumber and other suppliss.)
4

4. Four portable radio sete (SCR-300)should be provided for
oommmioatioxsbetween the MH, the mall boats end the landing party
during oable laying operatlone.
-----

-----

-----

-----

-----

-----

4,
,!

---*.

II

El!JCI.08URE
‘Ba
SUBMARINE CABLE SHORE STATIOlf
1. A shore ●tation will be required for etoring, splichgand

1
leading submarine oable. A flat plot of ground, preferably paved,
I
!

not leas than 100 I’%by 200 f% in size will be required, looatid
where an LSM aan dook or beaeh for long periods of’time. This area
should be adequately floodlightedfor nightime operatioazand 110-120
volt, 60 oycle AC ourrent mat
equlpnt.
2.

be available for the testing and spliolng

Not over 3KWwill be required.
TranzpmtatSon muzt be provided for transporting 332 reels

of oeble from the landing cloakto the storage area, There are 8 84-in
reels weighing approximately 14,000 lbe. eaoh, 121 78-in reele uoighing
21