(e) Furnish 10 snatohblookswith sheaves not le6s than 15 Inohea in dizmeter with auffioient clearance to pass splioea 3 inohes in diameter without binding. Blocks to be equipped with swivels and 6hackle6 for attaching the blookz to @OyO@. 3. The followingmaterial should be procured and plaoed on board the LSM et the yard whioh it Is fitted out as a sable shipf (A list of supplies including variouz taokle, pit logs, navigational equipment, s~cial dunnage lumber and other suppliss.) 4 4. Four portable radio sete (SCR-300)should be provided for oommmioatioxsbetween the MH, the mall boats end the landing party during oable laying operatlone. ----- ----- ----- ----- ----- ----- 4, ,! ---*. II El!JCI.08URE ‘Ba SUBMARINE CABLE SHORE STATIOlf 1. A shore ●tation will be required for etoring, splichgand 1 leading submarine oable. A flat plot of ground, preferably paved, I ! not leas than 100 I’%by 200 f% in size will be required, looatid where an LSM aan dook or beaeh for long periods of’time. This area should be adequately floodlightedfor nightime operatioazand 110-120 volt, 60 oycle AC ourrent mat equlpnt. 2. be available for the testing and spliolng Not over 3KWwill be required. TranzpmtatSon muzt be provided for transporting 332 reels of oeble from the landing cloakto the storage area, There are 8 84-in reels weighing approximately 14,000 lbe. eaoh, 121 78-in reele uoighing 21 Seation XI “