consolidated Froperty Account AP 330, was charged with the responsibility of furnishing the’tisk force in the Pacific Proving Ground with Army equipment and common supplies (“ticeptFOL and subsistence). b. General: In order to fulfill the overall Depot mission, items were generally maintained at a 180 day level which included a 120 day order and shipping time, plus 30 day supply and 30 day reserve on hand. Normal requirements were requisitioned through bersea Supply Agency, Fort Mason, California, with emergency requirements requisitioned m &waiian Army Ekme Command. Major items were re- quisitioned by or through CJTF SEVEN since many of the requirements of other task groups were not known. The build-up for Operation REDWING commenced in May 1955 withan initial computation of stock levels for supplies to be furnished by the respective Technical Service, Final levels were set for 4,000 personnel with a 10% overage factor to allow for con- tangencies; interim period reqtirenents were based on a population of 1,000. Supplies and equipment fron the United States were forwarded to the Naval Supply Center, Oakland, California for surface transportation. Air shipments were sent through Travis Air Force Ease. All lift shipments were coordinated by JTF SEVEN Liaison Office, Oakland, California, and requests to expedite were directed to that office. Tonnages are appended.10 c. Highlights and Problem hreas: (1) Spare hrts: 10 - TI!BI Since spare parts stock levels are - r