wane one

SFO.43 4
(3. 50}

SHEEY wo. 2? of68

COMPLETION REPORT FOR

4S-BUILT DRAWING NUMBERS ANDO DATES:

wien

nero

23-335

11/16/50

28-184

ho.

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

JOB NO. 640

CONTRACT NO.

For:

11/16/50

aT-( 29-11-507

LOCATION

PARRY ISLAND - SITE "Bb"

The Complete Construction of Maintenance Warehouse

Buildin g

:

No.:

323

»

cCSTIMAT

28-429 11/16/50

STIMATE

"Property
Account

Page 104
"Not for use by Af
DATE OF THIS REPORT:
*
14 November 1950

DESCRIPTION OF PROPERTY UNITS

Quantity

Unit

Constructlon
Contract

Est'd, Vaiue
Goveparal shed |

Engineering
Cost

T

otal

MAINTENANCE WAREHOUSE

This is a one story twin gable (parallel), single roofed, prefabricated alusinua

building, erected on a concrete slab, sise 51'=2" x 101'~10 1/2", complete with
electrical wiring and fixtures, telephone installationa, fresh and salt water

plumbing, alumirum partitions and four sliding doors. The size I.D. is 50'-O"
wide x 100'-8 1/2" long x 10'-O" mean height, with a cubic content of 19,950
cubic feet, and a floor area of 5,212 square feet.
This building includes the following equipment:
and one water cooler with drinking fountain.

One issue counter with shelves,

1

Each

Direct

Indirect

$2h, 351.25
6,975 92

BR

$818.00

$32,145.17

*Prorati
Charges on
to ofUnits

Select target paragraph3