ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

5FO.43 4

(3. 30)

COMPLETION REPORT FOR
JO8 NO.

AS-8uUILT DRAWING NUMBERS AND DATES:

2B-156

64,0 -1

12/23/50

For:

12/23/90
2B-329
12/23/50
2B-426—4 12/23/50
25-120

“Property
Account

CONTRACT NO.

LOCATION

AT—( 29-1 1)-507

Tne Complete Construction of
Buliding No.:

SHEET wo.

S

43

OF. 68

"Not for use by Aq
PARRY ISLAND — SITE "3"

pose 205

DATE OF THIS REPORT:

23 December 1950

Plumbing and Refrigeration Repair Shop

Ry
ESTIMATE

DESCRIPTION OF PROPERTY UNITS

Quantity

unit

1

Each

Construct lon
Contract
Cost

Est'd. Value
Gov.Materlal
Furnished

Engineering
Cost

Total

PLUMBING AND REFHIGEAATION RePAIR SHOP
Une story aluminum construction; rectangular shape; sise J.D. 24'-O" x Bo'-8 1/2"

xX 12'~0"; set on 5" thick concrete slab; double roof, separated by 2" x i" red-

wood; vented window panels; aluminus partitions; shelving; benches; 3 hot lockers;
outside pipe rack; with light and power services; plumbing; floor area 0.D.
2,060 square feet; cubic contents I.D. 19,370 cubic feet; three sliding doors.
installed equipment includes:

(Ome water cooler, one grinder, and two telephones.

Indirect

5,376.3h

Se...

$319.98

dog

$19,938.22

“Prorat;
'
fon of
|
Charges to units

Select target paragraph3