ATOMIC ENERGY COMMISSION SANTA FE OPERATIONS OFFICE 5FO.43 4 (3. 30) COMPLETION REPORT FOR JO8 NO. AS-8uUILT DRAWING NUMBERS AND DATES: 2B-156 64,0 -1 12/23/50 For: 12/23/90 2B-329 12/23/50 2B-426—4 12/23/50 25-120 “Property Account CONTRACT NO. LOCATION AT—( 29-1 1)-507 Tne Complete Construction of Buliding No.: SHEET wo. S 43 OF. 68 "Not for use by Aq PARRY ISLAND — SITE "3" pose 205 DATE OF THIS REPORT: 23 December 1950 Plumbing and Refrigeration Repair Shop Ry ESTIMATE DESCRIPTION OF PROPERTY UNITS Quantity unit 1 Each Construct lon Contract Cost Est'd. Value Gov.Materlal Furnished Engineering Cost Total PLUMBING AND REFHIGEAATION RePAIR SHOP Une story aluminum construction; rectangular shape; sise J.D. 24'-O" x Bo'-8 1/2" xX 12'~0"; set on 5" thick concrete slab; double roof, separated by 2" x i" red- wood; vented window panels; aluminus partitions; shelving; benches; 3 hot lockers; outside pipe rack; with light and power services; plumbing; floor area 0.D. 2,060 square feet; cubic contents I.D. 19,370 cubic feet; three sliding doors. installed equipment includes: (Ome water cooler, one grinder, and two telephones. Indirect 5,376.3h Se... $319.98 dog $19,938.22 “Prorat; ' fon of | Charges to units