aorta.

.43e
70.43

ATOMIC ENERGY COMMISSION
SANTA

FE

OPERATIONS

OFFICE

COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:

2B-190

JOB NO.

-1/19/51

26-372.—19/51
28-434
28-5168 1/19/51
1/19/02

CONTRACT NO.

For:

S

AT-( 29-1 }-507

sweet wo._4l
¥

Ge..

LOCATION

or_68

“Not for use @y ronee

PARRY ISLAND - SITE "Bp"

10)

DATE OF THIS REPORT:

19 Jamary 1951

The Complete Construction of Control Building
Bwiiding
ing
No.:
No.: 311
ESTIMATE

"Property

Account
Number

DESCRIPTION OF PROPERTY UNITS

Quantity

unit

Construction

Contract
Cost

Est'd.

Value

Gov. Furnished|
Materlal

.

Engineering
Cost

Total

CONTROL BUILDING
One story aluminwa construction; rectangular shape; sise I.D. 24'-0" x 2h'-8 1/2"

x 12'-0"; set on 5" thick concrete slabs double roof, saparated by 2" x lh" redwood; vented window panels; aluminum partitions; with lighting and power services;

plumbing; floor area 0.9. 651 square feet; cubic content I.D. 5,930 cubic feet.
Installed equipment includes a dehumidifier unit.

1

Each
Direct
Indirect

$4,979 012
3,874.57

$69.16

$6 922.85

.

.

Proration
Units
arges to of

Select target paragraph3