o

yd

a

ATOMIC ENERGY COMMISSION

SANTA FE OPERATIONS OFFICE

SFO. 430
(8. 50)

AS-BUILT DRAWING NUMBERS AND DATES:
2B-1i,
11/18/50
2B+163

11/18/50

2B~334
2B-427)=—
188-1801

11/18/50
11/18/50
11/21/50

“Property

Account
Number

SHEET MO.

COMPLETION REPORT FOR
JOB NO. 640 - ld

CONTRACT NO.

For:.

_AT-—( 29-11-50?

LOCATION PARRY ISLAND - SITE "B®"

68

21 November 1950

ESTIMATE

unit

Construction

Cont ract
ost

Est'd. Value

Gov. Furnishea}
Material

§&"9 {neering

Total

.

Choracs tounits

MATERIALS TESTING LABORATORY
This is a one story, double roofed, prefabricated alusinus building, erected on a

concrete foundation, size 25'-2" x 2$'-10 1/2", which includes a foundation pit
for a 300,000# Universal Teating Machine, complete with electrical wiring and
fixtures, telephone, and fresh water plumbing. The size I.D. ia 24'-0" x 2h'8 1/2" x 10'-0" mean height, with a cubic content of 5,930 cubic feet and a floor
area of 651 square feet.
This building contains the following equipment: One testing machine, one bench,
one counter, four tanks, one sink, one hot plate, and a fire extinguisher;
the
furniture includes: One table, one chair, and one typewriter.

1

°

DATE OF THIS REPORT:

i
Materials
Testing Laboratory

Bullding No.: 309

Quantity

OF

@ P
100
"Not for use by A-E -

The Complete Construction of

DESCRIPTION OF PROPERTY UNITS

LO

Each

Direct

Indirect

$17,353.68
3,323.75

$255.57

-

$20,933.30

TIQN
tne inf,

tion affecting

of the United Staten Ite
aur
o@ts contents
newt

tin
bbe

person is

criminal
Law.”

Select target paragraph3