ae

ATOMIC EWERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO-43 4
(3. 90)

COMPLETION REPORT FOR
#08 NO.

AS-BUILT DRAWING NUMBERS AND DATES:

oi

For:

Tye

28-339 «=11/13/50
28-942 11/13/50
—
"Property

CONTRACT NG.

640 - ld

LOCATION

AT=-( 29-1 1-507

"Not for use by A-E

DATE OF THIS REPORT:

PARRY ISLAND - SITE "B®

13 November 1950

The Complete Construction of Construction Materials Warehouse

Bullding No,: 308
ESTIMATE
—

DESCRIPTION OF PROPERTY UNITS

eoune

SHERT wo. 37 or 66
” Page 99

ea!

Quantity

unit

1

Sach

—
Construction

Contract
Cost

Est'a, Value -

Gov.Material
Furnished;

,

;

“Td! Cost
neering

Total

CONSTRUCTION MATERIALS WAREHOUSE
This is a one story, twin (parallel) gable s
aluminuzs building, size I.D. 50'-~O" x 100'-8

@ roofed, prefabricated
1/2" x 10'-O" mean height, erected

on a S1'=2" x 101'-10 1/2" concrete slab 5" thick; complete with electrical
wiring and fixtures, telephone service, and four saliding doors closing two wall
openings 6'-)] 1/2" wide in each end. The building has a cubic content of

49,950

cubic feet and a total floor area of 5,210 square feet.

Direct

Indirect

SREET

$23,555.90
6,955.66

$808.16

$31,319.12

“Proratl

t

orationto o Units
Charges