ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 434
(3. 90)

AS-BUILT ORAWING NUMBERS AND DATES:

JOB NO.

640 - ld & 1j

CONTRACT NO,

For:

SHEET WO.

SiaieietsT

COMPLETION REPORT FOR
AT—( 29-1 1-507

5.

or

66

P,
"Not for usa@py AH

LOCATION PARRY ISLAND - SITE "B*

DATE OF THIS REPORT:

23 December 1950
19 March 1951

The Complete Construction of P.O.L. Pump House and Facilities

Building No.: 300, 153 thru 156, 162, 30h, 305, and 307
ESTIMATE
"Property
Account

T
DESCRIPTION OF PROPERTY UNITS
FIRE PROTECTION PUMP HOUSE -

2

it
Quantity

Unit

1

Each

1

Each

i

Each

1

Each

Construction
Contract

Estid.
. F Value
i
Goveeerrgsned

Engineering
Cost

Total

(P.S. 252 ~ 2 Shts.

Adjacent to the enclosed area, a one story wood frame, shed roof corrugated

eluminus covered, wood louver siding, erected on a 5" concrete floor slab with
pump foundation, siae 10'-O" x 12'-0" x 8'-6" mean height, complete with electric

wiring and fixtures. A pump in this station connects to the |" salt water main
and provides high pressure for two 3” underground lines feeding fire hydrants

located on the south and east sides of the enclosure.

near the 3' gates within the area.

GASOLINE SEXVICS STATION
Outside the enclosure.

Hose shelters are provided

Installed equipment includes:

(Drawings

2

Qne pump unit.

118-326

Consista of a concrete island 3'-O" wide x 19'-0" long

x 16" thick, two gasoline pumps, one underground tank 5'-O" I.D. x 1'-O" long,

complete with electric wiring and fixtures, piping includes underground for
filling tank from Pump House, located approximately 125 feet outside of storage
enclosure. Installed equipment includes: Two pump meters.
BOsT FUELING FACILITIES

Remote from the enclosure.

s

2

8,

1B

Consists of a 5000 gallon diesel oi] storage tank

sise 7'-O" I.D. x 16'-0" long mounted borisontally on reinfarced concrete piers,

with two fueling pumps and piping leading to the marine fuelers located on the

Freight and Personnel Piers extending 167'-O" off shore.

PIPING SYSTEMS FOR FUEL OIL AND GASOLINE
Consists mainly of " pipe and fittings and extend from the equipment included

in the report of Building #300, which is within the enclosed area, to the various
storage tanks, service racks, and pumps, and to the refueling buoy in the lagoon,

Suitable reinforced concrete piers (mastic covered) and pipe supports are provided.
All piping ie aluminum painted and stenciled red for gasoline, black for diesel
oi].

All tanks and equipeent aluminum painted.

The mbmarine section of the

piping syatems include 1000 feet of |" pipe and 100 feet of submarine hose.

Lines

Direct

$35,099.16

Pump House

Ind:
Direct

31,386ok7
32,225.70

TOTAL ~ P.O.L. Facilities

Direct

Ind

Indirec

a,

Indireo

36,794.17

15,198.96

$142,032. 2

539 es

$1,139.76

$73,833.09

$3,195.52

$106,286.65

$132.11

$47,556.77

$4,467.39

$229,678.51

4

*Prorati
f
Charges ono
to Units