ar ATOMIC ENERGY COMMISSION SANTA FE OPERATIONS OFFICE SFO. 434 (3. 90) AS-BUILT ORAWING NUMBERS AND DATES: JOB NO. 640 - ld & 1j CONTRACT NO, For: SHEET WO. SiaieietsT COMPLETION REPORT FOR AT—( 29-1 1-507 5. or 66 P, "Not for usa@py AH LOCATION PARRY ISLAND - SITE "B* DATE OF THIS REPORT: 23 December 1950 19 March 1951 The Complete Construction of P.O.L. Pump House and Facilities Building No.: 300, 153 thru 156, 162, 30h, 305, and 307 ESTIMATE "Property Account T DESCRIPTION OF PROPERTY UNITS FIRE PROTECTION PUMP HOUSE - 2 it Quantity Unit 1 Each 1 Each i Each 1 Each Construction Contract Estid. . F Value i Goveeerrgsned Engineering Cost Total (P.S. 252 ~ 2 Shts. Adjacent to the enclosed area, a one story wood frame, shed roof corrugated eluminus covered, wood louver siding, erected on a 5" concrete floor slab with pump foundation, siae 10'-O" x 12'-0" x 8'-6" mean height, complete with electric wiring and fixtures. A pump in this station connects to the |" salt water main and provides high pressure for two 3” underground lines feeding fire hydrants located on the south and east sides of the enclosure. near the 3' gates within the area. GASOLINE SEXVICS STATION Outside the enclosure. Hose shelters are provided Installed equipment includes: (Drawings 2 Qne pump unit. 118-326 Consista of a concrete island 3'-O" wide x 19'-0" long x 16" thick, two gasoline pumps, one underground tank 5'-O" I.D. x 1'-O" long, complete with electric wiring and fixtures, piping includes underground for filling tank from Pump House, located approximately 125 feet outside of storage enclosure. Installed equipment includes: Two pump meters. BOsT FUELING FACILITIES Remote from the enclosure. s 2 8, 1B Consists of a 5000 gallon diesel oi] storage tank sise 7'-O" I.D. x 16'-0" long mounted borisontally on reinfarced concrete piers, with two fueling pumps and piping leading to the marine fuelers located on the Freight and Personnel Piers extending 167'-O" off shore. PIPING SYSTEMS FOR FUEL OIL AND GASOLINE Consists mainly of " pipe and fittings and extend from the equipment included in the report of Building #300, which is within the enclosed area, to the various storage tanks, service racks, and pumps, and to the refueling buoy in the lagoon, Suitable reinforced concrete piers (mastic covered) and pipe supports are provided. All piping ie aluminum painted and stenciled red for gasoline, black for diesel oi]. All tanks and equipeent aluminum painted. The mbmarine section of the piping syatems include 1000 feet of |" pipe and 100 feet of submarine hose. Lines Direct $35,099.16 Pump House Ind: Direct 31,386ok7 32,225.70 TOTAL ~ P.O.L. Facilities Direct Ind Indirec a, Indireo 36,794.17 15,198.96 $142,032. 2 539 es $1,139.76 $73,833.09 $3,195.52 $106,286.65 $132.11 $47,556.77 $4,467.39 $229,678.51 4 *Prorati f Charges ono to Units