Loy

s

.. o
AS-BUILT DRAWING NUMBERS ANO DATES:

eee

12

2B=132

12/8/50

2B-618 12/8/50

4B-315 12/8/50

JOB NO. 640 - 1

tee

ele

Mba
Bp! a5

12/0/3

B-318

12/8/50

B-42k

12/8/50

4B-b20 12/8/50
4B-421 12/4/50

l*property

ATOMIC ENERGY COMMISSION
ANTA FE
OPERATIONS OFFICE
e

COMPLETION REPORT FOR
CONTRACT NO.

For:

FS~337 1/19/51

.

LOCATION

a OF THIS 1st

PARRY ISIAND ~ SITE "B*

The Complete Construction of Power and Distillation Plat and Addition

Buliding No.:

DESCRIPTION OF PROPERTY UNITS

Account

AT—(29-1)-507_

sucet wo.3H sor68

Ses

Pages 90, 94, 9-2

Not for use by A-

December 19

19 April 1951

301

ESTIMATE
Quantity

Unit

Construction
Contract

Est'd. Value

Gov.purntshed

En

gineerin
9
Cost

.

Total

Prorati toUnits
f
Charges

POWER AND DISTILLATION PLANT BUILDING AND ADDITION
One etory concrete and alumimm construction, rectangular shape, sise I.D. 52'-0"

x 88'=8 1/2" x 18'-O", set on 6" reinforced concrete slab, with drain facilities
and pipe tunnels, reinforced concrete equipment foundations and columns; 6'-0"

high x 9" thick concrete walls below §'-0" wall panels; twin gable roof with

longitudinal drain trough at center, double roof separated by 2" x )" redwood,

vented window panels, aluminum partitions, chain link and pipe fence; piping; with
electrical services and alarm systems; plumbing; floor area 0.D. 5,626 square feet;
cubic content I.D. 87,400 cubic feet.
Installed equipment includes: One water cooler with drinking fountain and piping
systems for compressed air and fuel of] leading to four tanks outside the building,
These piping systems are in addition to the salt ami fresh water piping systens

within the building.

Costs recorded on this sheet does not include equipment

installed for generating electrical power and water distillation.

1

Each
Indirect

28,030. 48

$872.67

$7,362 pers)

J

Pod ty

¥

‘

¢

Select target paragraph3