Loy s .. o AS-BUILT DRAWING NUMBERS ANO DATES: eee 12 2B=132 12/8/50 2B-618 12/8/50 4B-315 12/8/50 JOB NO. 640 - 1 tee ele Mba Bp! a5 12/0/3 B-318 12/8/50 B-42k 12/8/50 4B-b20 12/8/50 4B-421 12/4/50 l*property ATOMIC ENERGY COMMISSION ANTA FE OPERATIONS OFFICE e COMPLETION REPORT FOR CONTRACT NO. For: FS~337 1/19/51 . LOCATION a OF THIS 1st PARRY ISIAND ~ SITE "B* The Complete Construction of Power and Distillation Plat and Addition Buliding No.: DESCRIPTION OF PROPERTY UNITS Account AT—(29-1)-507_ sucet wo.3H sor68 Ses Pages 90, 94, 9-2 Not for use by A- December 19 19 April 1951 301 ESTIMATE Quantity Unit Construction Contract Est'd. Value Gov.purntshed En gineerin 9 Cost . Total Prorati toUnits f Charges POWER AND DISTILLATION PLANT BUILDING AND ADDITION One etory concrete and alumimm construction, rectangular shape, sise I.D. 52'-0" x 88'=8 1/2" x 18'-O", set on 6" reinforced concrete slab, with drain facilities and pipe tunnels, reinforced concrete equipment foundations and columns; 6'-0" high x 9" thick concrete walls below §'-0" wall panels; twin gable roof with longitudinal drain trough at center, double roof separated by 2" x )" redwood, vented window panels, aluminum partitions, chain link and pipe fence; piping; with electrical services and alarm systems; plumbing; floor area 0.D. 5,626 square feet; cubic content I.D. 87,400 cubic feet. Installed equipment includes: One water cooler with drinking fountain and piping systems for compressed air and fuel of] leading to four tanks outside the building, These piping systems are in addition to the salt ami fresh water piping systens within the building. Costs recorded on this sheet does not include equipment installed for generating electrical power and water distillation. 1 Each Indirect 28,030. 48 $872.67 $7,362 pers) J Pod ty ¥ ‘ ¢