COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
LLB-

JOB NO. 640 - ld & 1J

11B-413

113-41

rari

1eeaieo

i338

ela

11B-41,

ya

aes

yula

11B-417

12/23/50

11B-4Wl2 «(3/19/51

B-427

3/19/51

FS-3

3/19/51

2B-3193 12/23/60
«12/23/50

11B-h10 «3/19/51
3/19/a

“Property

1LABG156 «(3/19/52
3/19/e

FS~252-1
«3/19/51
FS-262-2 3/19/Al

For:

Number

.

CONTRACT NO. 29-11-507_
Buliding No.:.

7

.

LOCATION PARRY ISLAND - SITE "B"

DATE OF THIS REPORT:

pPages 86, 87, 87-1

Not for use by A-E

23

December

1950

te March 1951

The Complete Construction of P.O.L. Pump House and Facilities

300, 153 thru 158, 162, 30h, 305, and 307

ESTIMATE
Quantity

DESCRIPTION OF PROPERTY UNITS

Account

water we.
Saipan.

unit

Construction

Cont ract
Cost

Est'd. Vatue

Gov. Furnished
Materlal

Enal

m8 ee ng

*p

PUMP HOUSE - Building $300
One story aluminum construction; rectangular shape; size I.D. 2)'-0" x 32'-8 1/2"
x 12'-0%; set on 6" thick reinforced concrete slab; double roof separated by
2" x k® redwood; vented window panels; sliding doors piping, including strainers,
pressure regulating valves, snd clayton control valves, etc.; with light and
power services; plumbing; floor area 0.D. 852 square feet; cubic content I.D.

7,850 cubic feet.

Installed equipment includes: Four pump units, two air eliminstors, two roto
mctors, four dehydrators, and ons telephone.

1

Each

1

Bach

1

Each

P.O.L. FACILITIES
The P.O.L. Facilities; within a 5’ chain link and barbed wire fenced enclosure,
approximately 150' wide by 100' long, having six 10' gates and three 3' gates,
and « system of stabilised dikes providing drainage to « large borrow pit outeide
amd adjacent to the enclosures, include the following:
GASOLINE STORAGE - Structure $307

Conaiste of one 1000 barrel (42,000 gallon) steel cylinder tank vertically mounted

on

gallon)

ted sand and crushed rock foundation and four 10,000 gallon (10,000

steel cylinder tanks horisontally mounted 3'-O" above grade on reinforeed

piers interconnecting 4" pipe and fittings to and from the Pump House (Bldg. #300)

continues to the truck loading rack (painted bright red) and the refueling bucy
between two mooring buoys in the lagoon. Total storage capacity 62,000

of gasoline.

DIESEL OF“ STORAOR - Structures $30), & £305
Consists of two 1000 barrel (8,000 gallons) steel cylinder tanke vertically

sounted on
(50,000 gallon)

eend and crushed rock foundation and five 10,000 gallon
steel cylinder tanke horisontally mounted 3'-O" above grade on

reinforced comerete piers, interconnecting i" pipe and fittings, the piping
ayeten contimies to the added storage covered by Change Order #177.
ADDED STQHAGE ~ 5!

s

thru

Consists of eix 1000 barrel (252,000 gallons) steel cylinder tanks vertically
mounted on reinforced concrete foundations, octagonal ehape, 23'-O" from side to
side, top 7" above grade. Total storage capacity 386,000 gallons of diesel oil.

tanks are not presently installed.
Three of these
;
Contimed om next page

Set

Thi
we document

1

Bach

[ratemianion ar
jn apy manner
promibited
poneities «

;

Charges to unites

Total

"

Man

Select target paragraph3