ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 436
(3. 80}

JOB NO. G40 ~ ld

AS-BUILT DRAWING NUMBERS ANO DATES:
FS~362-1 2/24,/51
FS—382-2 2/24/51

CONTRACT NO.
For:

SHEET MO.

Shot

COMPLETION REPORT FOR
AT-( 29-11-507

LOCATION

“Not for use by A-E

b

Page 15h

DATE OF THIS REPORT:

PARRY ISLAND = SITE "B*

_ 2h February 1951

The Complete Construction of Recreation Building
Buliding Wa.:

or &

237

ESTIMATE
“Property

DESCRIPTION OF PROPERTY UNITS

count

Quantity

Unit

1

Each

Construction

Cont ract
Cost

Est'd. Value

Gov. Furnished]
Material

c

/

Fog! neering

Total
°

RECREATION BUILDING
This is a one story, double roof, prefabricated aluminum building erected on a

5" concrete floor slab, size 25'-2" x 145'-10 1/2", camplete with electric wiring
and fixtures and freeh end salt water plumbing. The inside dimensions 1)),'-8 1/2"

x 24'-0" x 10'-O" high gives a cubic content of 34,730 cubic feet and a floor
apace of 3,473 square feet.

Installed equipment includes:

One water cooler with drinking fountain.

Direct
Indirect

$21,589 .56
8,732.99

Senetmae

$509 .80

$30,632.35

.

Proration of

Charges to Units

Select target paragraph3