ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

he o

6
AS-BUILT ORAWING NUMBERS AND DATES:

JOB NO.

2B-S161 2/2h/51

23-5326
2B-SiiG

640 = ld

2/24/51
2/24/51

OPLETION REPORT FOR
e

“CONTRACT NO.

For;

_AT-( 29-1 )-507

eee,

“Not for use by ade Page 10,

LOCATION PARRY ISLAND - SITE "B*

OATE OF THIS REPORT:

sutet wo._32 or68

2h February 1952

The Complete Construction of Showers and Latrine, 100 Man Capacity
Bultding No.: 233, 234, 235, ami 236
ESTIMATE

"Property
A

Number

o

SCRIPTION OF PROPERTY UNITS

Quantity

Unit

4

Each

Construction
Contract

Cost

Est'd. Value

Gov.

Furnished

Material

Engineering

Total

$139.55

$17,678.11

Cost

SHOWERS AND LATRINE - 100 Man Capacity
A one story wood frase gable roof and sides corrugated aluminum covered, on 6"

concrete finished floor slab with " x 4" curbing for all walle md partitions,

sise 0.D. 25'-0" x 36'-0" x 10'=0", complete with electric wiring and fixtures,

freeh and salt water plumbing, total floor area 900 square feet.

The equipment includes:

Six toileta, six toilet enclosures, six urinals, 16

lavatories, 10 shower heads, sight mirrors, three duckboards, and, outeide

mounted on a cencrete pad, ome water cooler with a drinking fountain.

1 Unit

TOTAL - 4 Units

Direct

Indirect

$10, 795-52

6, 7h3.0k

$70, T12.b6

.

Proration of

.

Charges to Units