o_— -

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFo.43 6
(3. 80)

JOB NO. 640 - 1

AS-BUILT DRAWING NUMBERS AND DATES:

28-067
23-5133

1/19/51
vii

CONTRACT NO,
For:

2BeSk2l 1/19/51

AT-(29-1}~507

ng No,:
Now: 232

DESCRIPTION OF PROPERTY unITS

Quantity

unit

Construction

c ont ract

Est'd. Value

.F ahed
Goveere

Engineering
Cost

Total

One story aluaimm construction) rectangular shape; sise I.D. 2)'-O" x 56'-8 1/2"
x 12'-0"; set on S" thick reinforced concrete slabs dable roof, separated by
2° x 4” redwood; vented window panele; wood partitions; work benches; with
electrical services; plumbing; dehumidification equipment; floor area 0.D. 1,156
square feet; cubic content I.D. 13,610 cubic feet.
Three dehumidification unite.

1

Page LS

DATE Of THIS REPORT:
19 January 1951

SCIEMTIFIC USERS BUILDING

Installed equipment includes:

OF 6a

ESTIMATE

l* property
Account

2

"Not for use@y A-E

LOCATION PARRY ISLAND - SITE "5"

The Complete Construction of Scientific Users Building

Bull ak

2B-5015 1/19/51

SHEET WO,

Saliiediedeel

COMPLETION REPORT FOR

Each

Direct
Indirect,

$10,997.25
$,685.07

ine. -

$226.53

:

$16,908.85

*Proratl

'

to oUnite
Charges on

Select target paragraph3