ATOMIC
$FO.436
(2. 90)

SANTA

FE

ENERGY

COMMISSION

OPERATIONS OFFICE

COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS AND DATES:
2B-391
3B-2118-4

varie

2B~Su11

1/19/51

JOB NO. 640 -ld

CONTRACT NO, AT-{29-1)-507_
For:

SHEET wo.30 or68

Ouest

.

LOCATION PARRY ISLAND - SITE “B*

DATE OF THIS REPORT:
ly January 1951

The Complete Construction of Laboratory Bailding

Not for use by A~E

Page 84

Bullding Now: 231
ESTIMATE

*Property
Account

SCRIPTION
DESCRIPTI

OF PRO PERTY

UNITS

u
y
Quantit

unit

Construction
cerec
Contract

Est'd. Value

Gov.uaterra
Furntshed|

Enal
Cost
Engineering

Total

$311.49

$33,507.60

LABORATORY BUILDING

Qne story alumimm construction; rectangular shape; sise I1.D. 24'-0" x 26'-6 1/2"
x 12'-0"; set on S" thick reinforced concrete slab; double roof, separated by
2° x L* redwoods; vented window panels; aluminum partitions; with electrical
services; plumbing; dehumidification equipment; floor area 0.D. 752 square fest;
cubis content 1.D. 6,890 cubic feet. Cabinet, shelving and benches. Hoist rail
and frame over 6" thick reinforced concrete slab, 15'-S" x 12'-6" — 193 square
feet.

Installed equipment includes: One dehumidification unit, two laboratory tables,
one hood assembly, one exhast fan, and om still.

1

Each
Direct

Indirect

$25,510.33

7,655.78

*p
Charges
porationto ofUnits

Select target paragraph3