ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

$F0. 436
(2. 90)

2B-0
ootis
2B—9p,

SHEET MO.

COMPLETION REPORT FOR
JOB NO.

10/18
ayes
11/18/50

CONTRACT NO,

640 - ld
For:

a

oo,

o F.

*Not for use by A-E

AT-(29-1)-507

LOCATION PaRRY ISLAND - SITE "B"

Page 63

DATE OF THIS REPORT:
18 November
1950

The Complete Construction of Commissary Building
Building No.: 230
ESTIMATE

"Property
Account

DESCRIPTION OF PROPERTY UNITS

Quantity

Unit

Construction
Contract

Est'd. Value
F
Goveerat
shed

Engineering
Coat

Total

$272.90

$10, 71,5.86

COMMISSARY BUILDING
Thie ie a one story, double roofed, prefabricated aluminum building srected on a
concrete elab sise 25'-2" x 69'-10 1/2" complete with electrical wiring, and
telephone installation, fire ext

eise ID. ie 2,'-0" wide x 60°-8

ieher, fixtures, and two sliding doors.

1/2" long x 10'-O" mean height with a cubic

content of 16,190 cubic feet and a total floor area of 1,760 square feet.

The

1

Each
Direct

Indi rect

$7,601.53
2, 67hokS

e

Proration
Charges
to ofUnits

Select target paragraph3