ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

st0.43 0
(3-50)

AS-BUILT DRAWING NUMBERS AND DATES:

30-6

1/31/51

hers

vara

tone

JOB NO.

F729 = 49

CONTRACT NO,

tet

30-03

For:

“property|
Property
Act
Number
__
.

AT~( 29-11-5907

LOCATION ENIWETOK aTOLL

_

DESCRIPTION OF PROPERTY UNITS

-

Be

sucet wo.
Not

.
Quantity

.
Unit

a

forguse

no
by

3Y January 195

The Complete Construction of Timing

_

¢

_

Construction
.
Contract
Cost
a

fst'd. Value

.
Gov. Furnished
Material

|

Engineering
:
Cast

Total

TIMING STATION NO, 6b OM SITE *C"

|}
|

1

Each
Direct

$24,506 , 87

TIMING STATION NG, 6b OM SITE "D - ¥*
One story reinforced conarete structure; rectangular shape; sise I,D, 23'-O0" x
13'-0* x 7'~6" highs floor area 0,f, 71] square feet; cuble content I,D, 2,242
oubie feet; explosion proof door; reinforeed concrete entrance slab sovering
space between eing walls 12° thick x 15'-3" long, arth fil) to roof level on
three sides, Floor drains at entrance leading to dry well below, Compressor
unite, dehupidification unite, power and lighting service within, Installed

equipment includes two dehunidification unite,

1

fach
Direct
26,750,144
Indireot 14,178, 41

589,59

41,518, 14

TIMING STATION NO, 6b ON SITE “E"
One story reinforoed conarete atructure; rectangular shape; sise 1,D, 23'~0" x
13'-0" x 7'=6" high; floor area 0,D, 711 square feet; cubic content I.D, 2,242
eublo feet; explosion proof docr; reinforced concrete entrance slab covering
epace between wing walle 12" thick x 15'-3" long, Rarth £111 to roof level on

“Thin dowd
the Natio
tranemberig

three sides, Floor dreing at entrance leading to dry well below, Compressor

units, dehumidification unite, power and lighting service within,
equipment inclodes two dehunidification units,

Installed

+eeetter,

1

- penaltive de

Eaoh

Direct

Indirect,

24,515.83

12,653,01
#-; .

;

.

CSTIMATE

| BB, L, REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:

One story reinforced concrete structure; rectangular shape; sise ID, 23'~O" x
135-0" x 7'=6" highs floor area 0,D, 711 square feet; oubic content 1,D, 2,242
cubic feet; axplosion préef door; reinforced concrete entrance alab covering
space between wing walie 12° thick x 15'=-3" long, Earth f111 to roof level on
three sides, Floor dreine at entrance leading to dry wll below, Conmpresscr
unite, dehumidification anits, power and lighting service within, Installed
equipment inclades teo dehunidification unite,

A-

DATE OF THIS REPORT:

,

Building No.: Station Ho, 6b

5

sage

SPs,

COMPLETION REPORT FOR

555,10

37,723.94

*Proration of .
Charges to Units

Select target paragraph3