ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

$FO.43 a
(3. 50}

COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS AND DATES:
3-082 ,1

JOB NO.

4/2/51

729 = 19

CONTRACT NG.
For:

AT=(29-1}-507 _

The Complete Construction of

Building No,:

SSL

"Not for use by A-E

LOCATION

DATE OF THIS REPORT:

SHEET NO.

NT WBPOK ATOLL

§% = Man Tent on Slab

.

Account

DESCRIPTION OF PROPERTY UNITS

Number

|

2 April 1951

Quantity

unit

Construction
Est'd.Vaiue|
onstruction
Est'd. Vaiue
Contract
Cast

Gov, Furnished}
Material

£

_
.

“Ca neering
Last

Total

TIT STATION Ge GN SITE "C*
33'~-10", slab area 504 square feet, eouplete with eleetric wiring and fixtures,

1

Each

Direct

Indirect

$146,

195,02

$ 2,59

$344.58

47,18
1%

1,24

49,66

10,12

682,53

TENT STATION Ge OM SITE "D - ¥*
AR oight man tent and wood frame bolted to a 4" concrete slab, sise 15'-10" x
31°-10°, slab area 504 square feet, complete with eleatrie wiring and fixtares,

2

Rash
bérect
Tadirect

TENT STATION Ge ON SITE "E"
4m eight man tent and wod frame bolted to a 4" concrete slab, sise 15'-10" x

31'-10", slab area 504 square feet, complete with electric wiring and fixtures,

|

1

Each

Direst

Indirect

440,18
232,23

err
my,

©

a

po

fp *

B,R.L, REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:

4n eight men tent end wood frame bolted to a 4" eonerete slab, sise 15'-10° x

OF

Station No, be
t¢STimMatlet

lap,
Property

@9

“Thin

the Nou
transmier
in any ma

prohibited
penaltex

.
Proration of

Charges to Unite

Select target paragraph3