COMPLETION REPORT FOR
JOB NO.

1/31/51

38-056

1/31/51

xa
roe

MaMa

729 - 19

CONTRACT NU, AT-(29-11-507__
For:

LOCATION

sHeet No.

oF.

_

“Not for use by A-E

ENIWETOK aTOLL

DATE

OF

THIS REPORT:

31 January 1951

Tne Complete Construction of Timing
Building No.:

63

Stations No, 6a
ts TIMATE

*proserty|
hewn
Number

OO

LESCRIPTION OF PROPERTY UNITS

TP

Quantity |

unit

Veonstruction |est'a. value| _
Contract
Cost

Gov.

Furnished

Materia!

|

*Proration of

Engineering

Charges to Units

a

M.R,L, REQUIRED CONSTRUCTION aBD LOCATION OF THE FOLLOWING STATIONS:

TIMIBG, STaTICN NO, 6a C8 SITE *c*
An existing structure modified, rehabilitated, and equipped, to be, in effect, a
duplicate of a new atruoture building 6b, Installed equipment includes two dehumidification unite,

1

Fach
Direct

Indirest|

$19,581, 23

10,716.76

$429.55

$30, 727 ¢ 54

17,744,59
6,185, 36

406,12

26, 336,07

TIMING, STATION WO, 6a OW SITE "D ~ V*
An existing structure modified, rehabilitated, and equipped, to be, in effect, a

duplicate of a naw structure building 6b,
hamidification units,

Installed equipment includes two de-

1

Each
Direct
Indirect

TIMING, STATICH MO, Ga OH SITE °E*
An existing sturcture sodified, rehabilitated, and equipped, to be, in effect, a

duplicate of a new strnoture building 6b,
humidification units,

Installed equipment includes two de-

1

Esch
Direct
Indirect;

18 736,74
- 8,467.24

426,78

27 ,630,76

N