COMPLETION REPORT FOR

CUNTRACT NG. —AT-( 29-1 1-507
For:

LOCATION

The Compiete Construction of

tet no

Santali

"Not

ENIWETOK aTOLL

for

oo
use by

A-E

DATE OF THIG REPORT:

2 Mey 1951

Balloemp Beds

Building No.: Stations 39a, & and o
BE>TtiMAlE

eroperty |
Account
Number

L

Of SCREPTION OF PROPERTY UNITS

_

PE Seal tion Pte vaine Po

Quantity

unit?”

Contract
Cisyt

Gov. Furnished
Material

Pngineen ng
wr

a

Charaes to unit

Total

:

SOBL REQUIRED CONSTRUCTION aND LOCATION OF THE POLLOWING STATIONS:
|

|
|

BALLOON BED, STATIONS 39a AND b, SITE "5"

wo reinforeed concrete footings, 1'-6" x 1°-6" x 361-0", and anchorage, 0.D,
215-6" x 36'=0", area of 774 square feet,

Coral fill,

2

|
|

Each

Direct

Indireot;

$2,734.53
3,160.07

$111.79

$6,006, 39

596,64
646,93

24,81

1,268 38

BALLOON BED, STATION 390,SITE “c*
Two reinforced concrete footings, 1'-6" x 1'-6" x 36'=-0", and anchorage,
21'=6" x 36'-0", area of 774 square feet,

Coral fil),

0,D,

1

Bach

Direct
Indirect