ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 420
(3-50)

<a

COMPLETION REPORT FOR

srr TT OPW AW IN NEIMAN LATE:

3G—082-1
3G-082-2

JOM NO,

F729 = 14

2/12/51
4/2/51

CONTRACT

For:

NOL AT~1 29-10-6507

The Complete Construction of
Huilding No.:

LOCATION

SHEET NO. 54 OF.

*Not

for use by A-£

DATF OF THIS REPORT:

EXIWETOK ATOLL

2 May 1951

Tents

/

Station 38
ESTIMATE

begert,
Bor

Nomte

|

unt

TTrim tion

COSCRIPTION OF PROPERTY UNITS

sr

oe

Quantity

Unit

Contract
Lunt

ee

ee

tst'd. Value
bov, Furnished
Material

a

.

Engineering
Cost
-

——-f—- -

_

' NOBL REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:

|

TENTS, STATICN 38, SITE **

4 four san tent with wood frame and wood floor, sise 0,D, 14'-2" x 14'-4", floor
‘area 0,D, 208 square feet, (Looation shown on drawing 7E-O89 and FS 503-1),

1

|
;

Direct
Indirect

$339 38
189,89

$17.59

$546, 86

TENTS, STATION 38, SITE "E"

A four man tent with wood frame and wood floor, sise 0,D, 1A'-2" x 14'-4% floor

area 0,D, 208 square feet,
!

Each

(Location shown on drawing 8C-5354),

1

KFach
Direct
Indirect

490 85
473,90

963.57

“Toe

|
a

the Nal
tranam{
In any
prohit i
petaai li

eee
Proration of
Charges to Units

Select target paragraph3