ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 420
(3-50)
<a
COMPLETION REPORT FOR
srr TT OPW AW IN NEIMAN LATE:
3G—082-1
3G-082-2
JOM NO,
F729 = 14
2/12/51
4/2/51
CONTRACT
For:
NOL AT~1 29-10-6507
The Complete Construction of
Huilding No.:
LOCATION
SHEET NO. 54 OF.
*Not
for use by A-£
DATF OF THIS REPORT:
EXIWETOK ATOLL
2 May 1951
Tents
/
Station 38
ESTIMATE
begert,
Bor
Nomte
|
unt
TTrim tion
COSCRIPTION OF PROPERTY UNITS
sr
oe
Quantity
Unit
Contract
Lunt
ee
ee
tst'd. Value
bov, Furnished
Material
a
.
Engineering
Cost
-
——-f—- -
_
' NOBL REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
|
TENTS, STATICN 38, SITE **
4 four san tent with wood frame and wood floor, sise 0,D, 14'-2" x 14'-4", floor
‘area 0,D, 208 square feet, (Looation shown on drawing 7E-O89 and FS 503-1),
1
|
;
Direct
Indirect
$339 38
189,89
$17.59
$546, 86
TENTS, STATION 38, SITE "E"
A four man tent with wood frame and wood floor, sise 0,D, 1A'-2" x 14'-4% floor
area 0,D, 208 square feet,
!
Each
(Location shown on drawing 8C-5354),
1
KFach
Direct
Indirect
490 85
473,90
963.57
“Toe
|
a
the Nal
tranam{
In any
prohit i
petaai li
eee
Proration of
Charges to Units