ATOMIC
SANTA

re sor

3B-5660., - 1/2/R

ANG DATES:

JUB NU.

ENERGY

COMMISSION

OPERATIONS

OFFICE

COMPLETION REPORT FOR

.

AG-RUTUL ORAWENG NUMER

FE

=F = WD

LONTRACT NO.
For:

Seer -

AT-1 29-44-07

LOCATION

]

.

KMTWETOK ATOLL

gHeet NO 9Gof |
Not

tor

use

Dy

A-E

DATE OF THiS REPORT:
2 April 1951

The Complete Construction of Pite

tuilding No.: Sations 622, 511, 512, 513, 52L2, 5152, 5162, 5163, 5172, 5173, S17h
Lo TIMATE

"Property

|

ee

ee

Bee

hecant.
Number 4

ee

a

oF: REPTION OF PROPERTY UNITS

wdce ce

Quantity

i

unit

Gonstru. tion

Contrast
Cyt

tst'd.

Value

vov. Furnished
Material

ee
'

co

Fag |neering

a.

Total

08

a

;

CharestOnits
*

ep ee eebf Le

|
| HEDL-4ML- REQUIRED CONSTRUCTION AWD LOCATION OF THE FOLLOWIMG STATIONS:

CONCRETE LINED PIT PANEL, STATION 622,LOCATION "2"

1

|

each

Direct

;

Indirect

|

$

28,82
37.17

$

.30

$

6.29

PIT, STATIONS 511, 512, 513, Tbe, 5152, 5142, 5163, LOCATION "Ef"

|

|
|

'~0" dia. x 4'~0" deep.

7

(

each
Dir eot
Indireot

:

16h, 41
237.92

1.90

ah.23

1.53

341.53

PIT, STATIONS 5172, 5173, Si7h, LOcaTION "3"

L'-0" die. x 4'-0" deep.

3

each
Dir eot

Indirect

148.457

191.53

“This docu:
the National 8
Trhrerntinmtr, +

ais PRM?

ey

pr Mitiwten
DEH Utas or,

manne
well

.
reernitos
af tie rontents

we “en "
vt

Select target paragraph3