ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

o.ada

wy sor

COMPLETION REPORT FOR

Bley eA a MAM

30-5658 ,2

ATs

JOH NG.

F729 =] 15

1/31/51

WONTRACE NG. AGHtY- br 07
for:

Huilding Now:
—
[ter

|)

ee

LCCATION

The complete Lonstruction vt

Number
-

Gest RIRTION OF

ye

-

|

4

PRUPERTY UNITS

a

eeee ee

91or

_-

tor use by A=E

DATE OF THIS REPORT:

9 March 1951

§tation 3§
1

eee
Const ta tian

'

“Not

BMT WETOX ATOLL

Boom on Tower

erty

Geant
we Klee

sHeer no

Saiegag.....

Quantity

Unit

Cortract
t

.

a.

oe +

tat'd,

ay
Value

f

ee

.

gineering
Cost

voy, turni sted
Material

ateria

feaeee 4. a

-

Total

|

on

.

hroration ot
Charges to Units

we eee

a

MOBL REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:

BOOM C8 TOWKA, STATION NO, 35, SITE "C*
Pipe booa with guy wire,

1

Each

Direct
Indirect

$300,72
161.54

$15.38

$497 64

300,73
161,54

15 38

497 ,65

15,38

497 (65

BOOM OM TOWER, STATION HO, 35, SITE "E*

|

Pipe boom with guy wire,

1

Direct
Indirest

;

|
|

Kash

BOCM OM TOWER, STATION NO, 35 SITE "D ~ ¥*
Pipe boom with guy wire,

1

Baoh
Direct
Indirect

300,73
161,54

|

“This dog

|

*

the Natu
tranemiat

N

hation affecting

Btod Metalen. Lta
Wo contents

in wny oY
hibttel

bed gernoe be

pre

ra} Lows.”

penaltiee

ere crtminal

a

.

Select target paragraph3