ATOMIC, ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFo. a3 a

170-813

3/9/52

For:

The Complete Canstruction of

52 oor _
use

for

"Not

.

LOCATION

CONTRACT NO, _AT-(29-1)-507

JOH NO, F729 = 15

Ao- Tt T DRAWING, NUMUERANG DATES:

SHEET NO

S art

COMPLETION REPORT FOR

—

A-F

by

UATE a THUG RE Poke Ll:
9 Saroh 1951

EMIWETOK ATOLL

Ground Shook

Building No,: Stations 36a thro f

we oe ESTIMATE

|

‘Property |
Account
Number
-

'

a
PESGERIPTION OF PROPERTY UNITS
_-

Quantity

Unit

Lost
a a ape i fp ee fee a

Ladin
ee 3

tat'd, Value
Gove ‘Furnished

Construction
Contca t

4

.

Material
—- - a t- ae

tor
Charges te Unite

Total
“4-0-2

-$-- -

2

; NOBL REQUIRED CONSTRUCTION AND LOCATIO@ OF TRE FOLLOWING STATIONS:
i

GROUND SHOCK STATIONS 360 THRU eo, SITE *D - ¥*

|
|

4 eteoi plate 12" x 14" x 1* thick with one flat ground surface, tapped holes for
gage mounting and anchor bolts, set level in concrete enbedded in bed rock and

encased with a 36" diameter corrugated neta) pips with temporary wood cover,

!

5

Each

Direct

Indirect

|

|$

984,59

1,068,64

$34.53

$2,087 ,76

64,09

2,851,00

GROUWD SHOCK STATIONS 36a THRU f,SITE "E*

/

A steel plate 12° x 16" x 1" thick with one flat ground surfees, tapped holes for
gage mounting and anchor bolts, set level in concrete embedded in bed rock and
encased with a 36° diameter corrugated meta] pipe with temporary wood cover,

é

Rach
Direct

Indirect

1,494,

|

1/295,25

ration affecting

“Thad
+ tile ak 6+

“ee

Inited Staten Iu

the National |

of jue contents

transi
in an

proba
pong:

if

et permon

evere criminal

‘ecterel Lawe

-

Select target paragraph3