_ ATOMIC ENERGY COMMISSION
S10. 430

SANTA

(3.50)

FE

OPERATIONS

OFFICE

sweet No.QO or

COMPLETION REPORT FOR

AS BUTE] DRAWING NUMBERS AND LATES:
176-810
3/9/51

JOB NO. TRO = 15

CONTRACT NO,
-

For:

T

_AT~{ 29-1 }~bU?

LOCATION

The Complete Construction of
Building No.:

*Not

EMIWETOK ATOLL

for use by A-E

DATE QF THIS RFPORT:
9 March 1951

Gauge Mounts

Stations 33a thru 1, 34a thru 4
ESTIMATE

"brogeety |
—

—

:\

fecunt

feo

2...

eee

OE od |
o REPTION
RAPTIE
eto:
OF

> Fae
:
PROFERTY
UNITS

uanti
Quantity

i
tin it

ee

TEeoastrution|Est'd. Value
ntrrack
Font

4

|

—

ia OF aero sned
i

Engineering
Cost

——}f —

‘

Total

——

, NOBL REQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:

|

GAUGE MOUNTS, STATIONS 330 THRU 1, SITE "Cc"

|

Steel stake, 2° diameter x 6'-O" long, with screw cap,

|

9

|

Each

Direct

|

Indirect]

$358,65
473,23

$14.99

$846, 27

997,58

68,92

2,523,939

1,591,65
135,26

60,37

2,407 ,28

530 ,57
251,47

28,19

$10,23

GAUGE MOUNTS, STATIONS 330 THRU 1, SITE*E®

Steel] stake, 2" diameter x 6'-0* long, with screw cap,

9

Bach

Direat

Indirect]

1,456,89

GAUGE MOUNTS, STATIOCUS 340 THRU d, SITE "C*

|

|

Steel stake, 2" diaseter x 6'-O" long, with screw cap,

4

Kach
Direct
Indirect

GAUGE MOUNTS, STATIONS 34a THRU d, SITE “E*
Steel atake, 2° diameter x 6'-O" long, with sorew cap,

4

Each
Direst
Indirect

“Proration

of

>
ono
Charges
to Unite

=

woe ee

Select target paragraph3