AS-BUILT DRAWING NUMBERS AND DATES:
100=257-1
3/28/51
100=257=2

3/28/51

100=257-3

3/28/51

FS-601

3/28/51

JOB NC. 730.3 - 9p

CONTRACT NO,
For:

l*property

Account
Number

“Not

AT~( 29-1 1-507

LOCATION

MUZIN ISLAND - SITE *S"

oe

or 38

for use by A-E

DATE OF THIS REPORY:
28 March 1951

The Complete Construction of Air Force Structure Type A-2,1

etn

;

Building Now: 3d

-

DESCRIPTION OF PROPERTY UNITS

Pn

Quantity

unit

_
Construction

Contract
Cost

ESTIMATE
“Est'a,

Value

Gov. Furnished
Materia!

ee

Ena;

.

ngineering
Cast

oe

Total

BUILDING HO, 3.3.4
4 reinforced concrete, brick and steel structure, pre-cast T shape columna, beans,

struts and coping, four bents wide, sise 0,D, 56'-10" x 106'-0* wide, ends open,
brick masonry side walls and metal window frames and sash, erected on 1'-4 1/2" x

51-4" depth foundation walls, laminated wood (2" x 6" finished 5 1/2" thiok) deck

roof with built up cover, two full length sky light monitors with fixed steel] sash,
and corrugated metal ends,

One side wall has structural stee] wing wall extensions

at each emi, aise 20'-6 1/2" long x 19'-6 1/4" high, the total height of the structare above grade is 25'-0", the covered area is 6,024 square feet,

1

Each
Direct
Indireat|

Piers for Displacement Gagea (Dwg, 100-262-1),

$70,076, 36
59,574.66

-O-

$129,651.02

A reinforced concrete structure

with a foundation footing 3'-0* x 4'=-0" x 9" thiok and a pyramid rectangular cross
section rising 10'-~O" above footing, tota] masse 1,5 aubic yards, Location to

be show on site plan,

2

Each

Coat included in Tnetrumentetton

Instrumentation

Direct
Indirect)

18,525, 38
17,359,29

$5,201.42

41,086,09

Total Structure and Instrumentation

Direct
Indirect)

88,601.74
76,933.95

§, 201,42

170,737.11

4

|

LL f ‘

+

100-262-1

SHEET no._ J}.

COMPLETION REPORT FOR

“4

ATOMIC ENERGY COMMISSION
“GANTA FE OPERATIONS OFFICE

SFO.43 0
(3. 50}

"Proration of

Charges to Units

Select target paragraph3