SFU

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

430

13.50)

SHEET NO.

COMPLETION REPORT FOR
ASe=rirti t

OR AWINI,

1N0-253-1
JE-059

NUMBERS

3/28/51
4/19/51

AND

DATES:

JO@ NO.

730.3 = 9q

CONTRACT

NO.

_?

AT~( 29-1 1-507 _

18

_ OF

“Not for use by A-E

LOCATION ENGEBI ISLaND - SITE "5"

DATE OF THIS REPORT:

19 april 1951

The Complete Construction of Air Force Struoture Type F-2
Building No-.:

12

243.28
ESTIMATE

Port te
“Property

_
Recek

eeee ee

|

|

+>

DESCRIPTION OF PROPERTY UNITS

Quantity

.
Unit

Construction
Contract

Est'd,

Value

v
.
Go ater ene?

Engi

.

gineering
Cost

*p

Total

TEST STRUCTURE 3,350
A two story brick building, gable roof sheet metal covered, erected on concrete

foundation walls 1'-4 1/2" x 5'-1" deep, sise 34'-0" x 42'-9", interior brick
walle supported by 1'-O* concrete foundation walls, five interior brick masonry

fire places, 3* bitusual conorete on sand support sleepers for tongue and groove

flooring of the firat floor, sand between second floor joist and ceiling joist,
motal lath and plaster covered walls and partitions except entrance and stair
hails, concrete entrance slab, complete with electrical wiring and fixtures to

provide an instrument work shop, the outside dimensions of each floor is 42'~1"
x 33'=4" giving a total floor area of 2,800 square feet, 10'-6" ceilings give a
cuble content of 29,400 cubic feat,

1

Eaoh
Direct
Indireot|

'
i
|

Instrumentation
Total Structure and Instrumentation

Direct

Indirect

Direct
Indirect;

$56 626,94
55,298,812

3,849.89

-O-

$111,925,75

3,279.43

$297 ,69

7,427 01

60,476, 83
58,578,24

297 69

119,352.76

:

roration
—
Charges
to of
Units