trBibice

ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

SFO. 434

(3.50)

AS-BUILT DRAWING NUMBERS AND DATES:

100=252-

3/28/51

100=252-2
100-252=3

3/28/51
3/28/51

100-262-1

3/28/51

100=252-4,

sweet W0..2O

COMPLETION REPORT FOR
Jo8 NO, 730.3 - 9o
For:

TT

The Complete Construction of
.
;

=

or 18

*Not for use by A-E
DATE OF THIS REPORT:

LOCATION MUZIN ISLAND - SITE "S"

28 March 19

air Force Structure Type C-1.)

2.3—3

ESTIMATE
Quantity

DESCRIPTION OF PROPERTY UNITS

Account

AT-1 29-4 1-507

Bullding Now:

3/28/51

“Property

CONTRACT NO,

—

Unit

Construction
Contract

Est'd. Value
*

Gove erp i shed

Engineering

* Proratj

'

Chargesfonto oO units

Cost

Totai

~O-

$371,665 06

BUILDING
A reinforced concrete, brick and steel structure, three section, sise 0,D, 120'-28"

long x 236'-8" wide, ends open, side walls of brick and concrete blocks, meta)
window frames and sash, erected on 1'% 1/2" x 5'-4" depth foundation walls, structural steel roof trusses supported by structural stes] columms on concrete pisrs,
built up roof over 2" plank deck and three skylight monitors, sides metal frames
and sash and ends covered with corrugated metal,

One side wall has structural

eteel wing wel) extensions at each end, sise 40'-6 1/2" long x 38'-6" high, the

total height of the structure above grade is 52'-4", the covered area is 28,798
aquare feet,

1

Rach

Direct

$216,674.17

Each

Costs inoladed in Instrumentation

Indirect
Piers for Displacement Gages (Dwg, 100-262-1),

154,790,89

A reinforeed concrete atructure

with a foundation footing 7'-0" x 9'-6" x 2'-0" thick and « pyramid of a rectang-

uley oross section rising 25'-0" above the footing, total mass 11,4 cubio yards,
Location to be shown on site plan,

Instrumentation

Total Structure and Instrusentation
Miscellancous Materials Furnished to Air Force

6

Direot

Indirect
Direct
Indirect
Direct

Indireat

40,875.21

38,087 ,29

$9,614.61

88,577 11

257, 749,38
192,878,18

9,614.61

460, 242,17

4,373 34

2,617, 63

&

-0-

,

6,990,97