ATOMIC ENERGY COMMISSION

re

~ "SANTA FE OPERATIONS OFFICE

AS-BUILT DRAWING NUMBERS AND DATES:
FS-132

2/10/52

JOB NO.

640 = 5j

:

CONTRACT NO.
For:
or:

SMM
.

-

COMPLETION REPORT FOR

AOMOM, BIIJIRI, ROJOA,

AT—(29-¢)-507__

Not for use by AE

LOCATION & EBERIRU GROUP - SITES "D-V" DATE OF THIS REPORT:

The e € Complete
|
Constructl
Construction o t Sewer Lines

10 February 1951

Building No.:
ESTIMATE
“Property

Account

DESCRIPTION OF PROPERTY UNITS

Quantity

unit

Construction

Contract

Est'd.

Vatue

Goverurnlsned

Engl
gineering

Cost

Total

$741.86

$11,615.76

SEWER LINES
The sewer lines consist of 750 feet of 8" V.C. pipe and four manholes, 200 feet
of 6* ¥.C. pipe, and a 220 foot outfall of 6" eorrugated metal pipe.

Other piping shown on this drawing includes 150' of 2" G.I. pips = fuel tank
drain, 150 of 2" brass pipe - motor cooling water, 60' of 1" pipe to the salt
Water well, and 90' of 2" pipe - water tower to pit.