ATOMIC ‘ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 436
{3.50}
4S-BULLT DRAWING NUMBERS AND DATES:
FS~1 32
re271
sven
9
1-2
2/2 51
FS-175-<
2/2/51
PSaiis2
JOB NO. 60 - 5i, 1, Sm
.
For:
2/24/51
CONTRACT NO.
SHEET WO.
16
OF.
AT-(29--1 1-507
Temporary Distillation Plant, 30' Elevated Water Tower, & Acid Tank Bldg.
101, 117, amd 119
ESTIMATE
Nant
DES
CRIPT On 0 F PROPERTY UNITS
Quantit 7
unit
1
Eaeh
1
Each
Construction
Contract
Cost
Est'd.
Value
Gov.Material
Furnished
Enai
.
gineering
Cost
Total
FRESH AMD SALT WATEA LINES
The fresh water lines consist of 845 feet of 3" transite pressure pipe and fittings
Branches 90 feet of 2", SO feet of 1 1/2", 15 feet of 1 1/k" and 230 feet of 3/k".
The selt water lines consist of 912 feet of 3" transite pressure pipe and fittings.
Branches 105 feet of 2", 75 feet of 1 1/h", and 50 feet of 3/k".
SALT WATER WELL & SUCTION PIPING
Adjacent to the power and water distillation plant, a well 16'-1" deep including
aover is provided with piping, foot valve, ani fittings which lead to the pumps
in the power plant.
VW
"Not for se by A-E
AQMON, BIIJIRI, ROJOA,
LOCATION & EBERIRU GROUP - SITES "D-V" DATE OF THIS REPORT:
23 Mareh 1951
The Complete Construction of Fresh & Salt Water Lines, Salt Water Well,
Building No.:
"Property
a
S hat
COMPLETION REPORT FOR
The well 0.D, 5'=-08 x 5'-0" x 16'=1" 18 of reinforced
concrete with seepage slots in the lower section.
1
TOTAL - Lines and Well
Each
Direct
Indirect
TOTAL = Distillation Equipment
Direct
Located in Bldg. #108
Indirect
$7,186.28
5199 oh?
$527.73
812,913.48
$125,706.34
9,931.77
$175,638.11
20! _BLEVATED WATER TOWER - Bldg. #101
One tower of timber construction consisting of an elevated platform 29'-0 5/8"
above grades; overall dimensions 15'=2" x 27'~9 1/2"; platform floor area ia 21
square feet; ladder; tower supports two tanke of 4,200 gallon capacity each.
1
Zach
Direct
Indirect
$6,460.36
§,573013
$37h.5k
$12,408.03
ACID TANK BULLDING ~ Bldg. fly
Ome story wood structure; rectangular shape; size 0.D. 8'=-0" x 12!'-0" x 9'~0";
eet on a 5" thick concrete slab; with water connection; floor area 0.D. 96 square
feet; cuble content I1.D. 685 cubic feet; special features and equipment: One
pump on concrete pad; one vertical tank,
1
Each
Indirect
75h
$1,227.18
TEMPORARY DISTILLATION PLANT - Bldge
This is a one story shed roof wood frame one side open, three sides louvers al)
round, corrugated aluminum covered rocf and sides, erected on a 5" concrete slab,
sie 257-0" x 5O'-O" total 1,250 square feet, complete with electric wiring and
fixtures, fresh and salt water piping, distillation units, pump and water pontoons.
Installed equipment includes:
Four distillation units, and one pumpe
1
Each
Indirect
penalties under atv |.
338-70
$50.50
$1,087.67
* Prorat;
roration of
t
|
Charges to Units