ATOMIC ENERGY COMMISSION

FFI
SANTA FE OPERATIONS OFFICE

FO. 43 4
{3.50}

S peep.

COMPLETION REPORT FOR

>“ BUILT DRAWING NUMBERS AND DATES:

FS-356-1
¥8-356-2

4/2/51

JOB NO,

640 + Sr

4/2/51

The Complete Construction of

sucer wo. 2

or__29_

Not for use by A-E
AOMON, BIIJIRI, ROJOA,
LOCATION & EBRRIRU GROUP - SITES "D-V" OATE OF THIS REPORT:

CONTRACT NO. 29-1)-507
For:

.

2 April 1951

Cargo Pier - Site D3

Buliding No. :

ESTIMATE
“Property
A

t

DESCRIPTION OF PROPERTY UNITS

Numbac

Quantit

,

unit

Construction
Contract

Cost

Est'd.

Gov.

Value

Furnished

Materla}

Engineering
Cost

Tota

CARGO Pim - SITE D3
A wood atructure off shore 20'-O" wide x 111'-O" long, consisting of sleven |,
pile-benta, with an approach section, bulkhead amt wing walls to the 10'-0"
elevation, stabilised 20 foot wide roadway approach, which is epproximately
175 feet long from shore.

2

Rach
Direet
Indixe ct

$79 Ty eal
55,291 432

$161.71

$135,432 2h

prohibited

"Proration of .
Charges to Units