COMPLETION REPORT FOR

AS-BUILT DRAWING NUMBERS ANDO DATES:
130-218

JOB NO,

640 - Sr

we

CONTRACT NO,
For:

SHEET NO.

AOMON, BIIJIRI, 20JOa,

_AT=( 29-1)-507

The Complete Construction of

a3

i?

LOCATION & EBERIRU GROUP = SITES "D-V"* DATE OF THIS REPORT:
1 April 19

Causeway Biijiri to Rojoa with Personsel

Bullding No.:

OF

“Not for use by A-E
+

*

.

<

ESTIMATE
"Property

DESCRIPTION OF PROPERTY UNITS

ecount

Quantity

unit

Construction

Contract
Cost

Est'd.

Value

Gov. Furnished|
Material

Engineering

Total

$1,525.92

$215,745.86

Cost

CAUSBMAY BILJIRI TO ROJOA
& wood structure, 20'-0* wide x 190'-i," long, consisting of 43 pile bents, bulkheeds, wing walla and approaches from each shore.

i

.
Each

1

Each

PERCOMIEL
Attached to causeway, a wood structure of pile bente and decking 5'-" wide x

22'-5" long x 6'-9 1/2" high above pile bracing.

Indirect

82, 29b045

*

Proration of

Charges to Units