«
to
Ao
ATOMIC ENERGY COMMISSION
SANTA
FE OPERATIONS OFFICE
COMPLETION REPORT FOR
-Pia tt
Die awit NUMBER
-
eee
eH
£4
CATES:
}
att
Jauis no,
862 - 10
Wein
CUNTRACT
for
The
3/9/52
3H-25b.4 3/9/52
rns
[trropeet,
Account
Number
'
ic. ATION
ENTWETOK ATOLL
suger no 93 or
Not
for
DATE
OF
use
by
A-E
THIS KL Rat:
9 March 1951
Huilding No.: Station Noe 621
-
ee oo
Last eb PTION OF
--
BU. AT-C29-1)- 07
omplete Construction of Wing Models
H-252.4 3/9/51
3H-253+3
.
wtee
-
copeeee
PROFERTY UNITS
Quantety
oo
at
tr TiMaAd:
pee EE
TMA
he
Unit
heonetra
wef
corto t
ut
fe eee
-
oe
a
ce
bP sthay value
wove. boarntoted
Material
ae
epgineerin
Doat Vag
ve
pecan
Total
"Proration of
Charges
tu unit:
—-—-
|
"AMG REWIReD CunSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
WIMG MODEL, STATION#821, SITR "E"
Accurately located reinforced concrete foundations as follows:
one each 14'-0" wide x 12'-O" x 3'-O" thick with two 14'-0" long ateel
By and Be
one seach 10'-0" x 1o'=0" x '-0" thidk with two 16'-O" long steel columns,
columns Bolted horizontally to each.
bolted nérisontally to each.
|;
|
|
|
By and By,
By
Concrete Total ~ 37.4 cu. yds.
Concrete Total - 47. su. yda.
i
one 10'-0" x 14'-0" x 3'-O" thick with threaded J bolts protruding, two deadnm, concrete, with 3/4" diameter protruding J bolts, size each 3'=<8" x 31.8" x
3'~O", one on each aide and steel junction box with underground conduit.
Concrete Total
- 17.6 Cus
yds.
|
B) one 61-0" x 12'=0" x 2'=0" thick with two 11'-O" long ateel columns bolted
ndriaontally and steel junction box with underground comuit.
Concrete Total - 4.9 cu. yda.
1
Each
Direct
Indirect
|
|
{
.
.
$239 0li7
$25,513.73
ION
‘
me thfermeeti ot. ih wtng
.
|
|
$1,948.47
10,625.79
*
4
Sie Vota Sy elae be
oele aed ia
ord eer iaet on ree og
alt ee ve fe rime]
nalts onder agin 4 isle bavhe tad Lawes