ATOMIC ENERGY COMMISSION
sEe
SANTK “PE “OPERATIONS OFFICE
SFO. 43a
(3.50)
COMPLETION REPORT FOR
Aa td | Ce AWITNG, NLIMeGE >
BH-250.4
3/9/51
3H-251.4 3/9/51
eat
Br
ud at
JOH NO,
30-088 3/9/51
3/9/51
8.2 - 10
17-617
(CONTRACT
For:
——
a
a
:
—_
ee
1ON ENIWETOK ATOLL
“Not
tor
DATE
of
oo
yO
Quantity
ef
TV eonst bo " on
unit
}
Contract
oo
use by
of
A-F
THIS REPORT:
9 March 1951
ESTIMATE.
fe
ns
OLSPRIPTION OF FROFERTY UNITS
:
|
Station No. 822
Building No.:
ua
ee
Accusynt
Number
AT-(29-1)-50?
The Complete tonstruction of Wing Models
BH-254.4 3/9/51
vert ’
NO.
SHEET WO. 109
Feattd.
Gov.
Value
Furaished
Material
Po
Engineering
Lost
j———-— -
*"Proration of
Cnarges to Units
fe
AMC ROYUIRED CONSTRUCTION AND LOCATIUN OF TH FOLLOWING STATIONS:
|
WING MODKLS,
STATION
#622,
SITE "S*"
Accurately located reinforced concrete foundations as follows:
B, and By one each 1h'-0" wide x 12'-~O" x 3'~O0" thick with two 1)'-0" long steel
columns bolted horizontally to each.
Concrete Total - 37-4 cue yds.
|
|
|
"
|
|
By and Bo one each 10'-O* x 16'-0" x 4'-0" thick with two 16'-0" long steel columns
bolted horizontally to each.
Concrete Total - 7.4 cu. yds.
one 10'-0" x 14'-O" x 3'-0" thick with threaded J bolte protruding, two dead~
edn: concrete, with 3/" diameter protruding J bolts, size each 3'-8" x 3'-8" x
3'=0", on# on each side and steel junction box with underground.
Concrete Total - 17.6 cu. ya.
By,
one 6'=0" x 12'-0" x 2'-O" thick with two 11'-0" long steel columns bolted
horizongbally and steel junction box with underground conduit.
Concrete Total - 4.9 ou. ydas
1
Rach
Direct
Indirect
$15,12).24
10,3588
$242.37
$25,721.49
CAUTION
a
Pe
inforftaatina ofieeting
United Qyates. Lee
pute of ite contents
vUhrieed pereun ts
Kh ln severe criminal
b Petree! Law *