ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
SFO. 430
(3. 501
eRy
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATE:
JOB NO.
3E-5696
4/2/51
5695.1 4/2/51
729 - 26
CONTRACT NO.
For:
LOCATION
AT—(29-11-507 |
The Complete Construction of
SHEET no. 98 of_ ee
"Not
ENIWETOK ATOLL
2 April 2951
Gengx Collimator Towers f1, #2
Stations 145 and 146
Buiiding No.:
ESTIMATE
-
ne ee
“Property
we ee
ee ee
Be a
-—
a
Loastric tion ]
Account
wee ee
0
ve SCREPTION OF
ee
oe
ee
PROPERTY UNITS
for use by A-E
DATE OF THIS REPORT:
Quantity
oe
Unit
—
mont rant
eh
Est'd.
—
Value
_
=
_
_——_——-— $—
engineering
OM tapes
Cost
a
Total
--
GANEX COLLIMATOR TOWER #1, STATION 145 OR SITE "D - ¥"
|
'
A steel tower sise 10'-0* x 10'-0" x 29'-8 5/8" high with timber deck, steel ladder,
GQhain hojet and trolley, sreated on a reinforced concrete foundation and footings
|
4t=0° mindaum below grade,
1
Each
Direct
Indirect
|
GANEX COLLIMATOR TOWER #2, STATION 146 ON SITE "D - ¥"
|
|
& steel tower, size 10'-0" x 10'-O8 x 19'-9 3/16" high, with timber deck, steel
ladder, chain hoist and trolley, erected on a reinforced concrete foundation and
| footings 41-0" sinimum below grade,
1
2,009,24
$251.51
$6,956,008
4,033.07
1,861, 51
213,66
6,108, 24
394,20
13,859, 66
2TT 29
9,478.18
Each
Direct
Indirect
|
$4,695 33
GANEX COLLIMATOR TOWER #1, STATION 145 Ol SITE "E*
|
A steel tower, 10'-O" x 10'-0" x 38'-2 3/4" high, with timber deck, ladder,
chain hoist and trolley, erected on a reinforced concrete foundation and
footings 4' mintsum below grede,
1
Each
Direct
Indirect
7,995 G4
5 469,82
GANEX COLLIMATOR TOWER #2,STATIQH 146 OW SITE "E*
A steel tower, 101-0" x 10'-0" 223'-) 3/6" high, with timber deck, ladder,
chain hoist and trolley, erected on « reinforced concrete foundation and
footings 4' siniaus below grade,
~
‘ ee in
r
yon ree!
Ny grad
pecattne wader
1
Each
Direst
5, 566,31
Indirect
3,634.58
Charges to Units
_--_--f _. —_-___.--
UCRL AND NRLK KEQUIRED CONSTRUCTION AND LOCATION OF THE FOLLOWING STATIONS:
|
—~
"Proration of
——_—