.
5FO. 43 a
(3. 50)
4623k5
h813h6
4068 NG. T39@e29e & d
ele
CONTRACT NO.
For:
AT-(29-1)-507
LOCATION
The Complete Construction of
2/6/51
3
of28
“Not for use by A-E
EMGEBT —- SITE *E*
DATE OF THIS REPORT:
6 February 1951
Mavwy Type Structure
Building No.: 3-202 8 and b
2/6/52
ESTIMATE
"Property
DESCRIPTION OF PROPERTY UNITS
Account
sHeer wo
Saerrt
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
on
ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
Quantity
Unit
1
each
Construction
Contract
Est'd. Value
Gov. furai shed
oo
Engi
;
ng Leet. ng
Total
BUILD]BG 3e2-)s
A reiaforoed soncrete test structure and foundation, sise 0.D, 28'-0" x 26!-0*x
1i'-0" with an enclosed hollow section 22'-0" x 22'-0* x 6'-0" — 212 cubio yards
of eonerete and steel, foundation located 6'-0" below grade.
Direct
Indirect
$29, 202.33
19,656.61,
Instrumectation
Dir ect
263.99
Total Structure and Instrmentation
Direct
29,486.32
-O-+
$48,858 .97
BOILING 3.2-1b
& reinforced concrete test structure sise 0.D, 281-08 x 26'-0" x 10'-6" above
grade and foundation 6'-0" below grade is made up of 203 precast cells,
etructarel steel supported and layer imbedded, walled in, and roofed over with
reinforced concrete. The totel cubic content of structure 0.D. is 305 cubic
yards.
1
each
Direct
Indirect;
Instrumentation
Total Structure and Instrumentation
Direct
Lb, 857.11
25,535.83
-0-
264.18
10,3929
Tadirect
195 099
253.80
713.97
Direct
Indirect
45,121.29
25,731.82
253.60
71,106.91
CA
te Pot
queers,
.
Thin das umeni s
fom
4 cae
.
ppb
"4
*Drorati
Charges to bart ;