SFO.43 0
(3. $0)
ATOMIC ENERGY COMMISSION
"SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR
AS-BUILT
DRAWING NUMBERS AND DATES:
60-09-11
(3 aheets)
JOB NO. 730.1 - &
2/14/51
CONTRACT NO.
For:
AT~( 29-1) )-507
SHEET NO.
poe
OF.
ig _
"Not for use by A-E
DATE OF THiS REPORT:
ls February 1951
LOCATION ENGEB] ISLAND - SITE "8"
The Complete Construction of Underground Test Shelter
Building Now:
2
Joh?
ESTIMATE
"property
Account
b--
DESCRIPTION OF PROPERTY UNITS
Quantity
This Underground Shelter is» sade up of a enin reinforced concrete structure
109-0" x 10°'-0" x 35'-0" long, Access to and egress from the mein shelter
ie provided by a tunnel 10'-0* x 10'-0* x 56'-0", Opposite the main shelter
and at right angles to the access tunne] is constructed an additional shelter
made up of pre-cast concrete pipe and corrugated iron pipe 101-0" in diameter
by 35'-0° in length, These total structures are covered with a 6'-O" compacted
earth f111, These structures cover a total of 1,260 square feet,
1
Unit
Construction
Contract
Estid.
Value
Gov.Furnished
Engineering
Cost
Total .
-O-
$42, 516,36
"Prorati
f
Charges1onto oO Units
> a
TEST
Instromentation
Tote] Structure and Instrumentation
eb
Direct
Indirect
$26,064.80
16,451,56
Direct
Indirect
12,411,399
13,347.39
Direct
Indirect
38,476.19
29,798.95
$4,263 ,07
30,041.85
4,283 07
72,558 21