ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
‘
Shue ada
—
HTT pe SAT
erste
uy
481349
2/6/51
481350
\*
AN
OAT
JOK NO. 730.2090 & f
For:
=“>ireae
CONTRACT ND, ATatdni baoOT
(uc aT+iON ESGEBI - SITE "Eg"
The complete Construction of
Builaing NO.:
Meya
BE
be net
- int
Nome.
vmeee
COMPLETION REPORT FOR
(Es RIPTION OF
-
\
see
PROFERTY UNITS
_
Oo
ee
"NOL for use hy Act
WATE
unit
wae
Thel o REPORT,
er
a
hte Satue “ae,
astra tor Phat
naifee ring
tov. burnished
a ee
wt
6 February 1951
avy Type Strusture
3,2.2— and b
Quantity
of 8
SHEFT NO _ y
ede
conteaut
uot
- -
—4-
Material
Ke ee
Hu
fee
Total
ee
“Proration of
Cha ryes
ae
BUILDING 2e2e28
A conorete test structure, size 21'-2" x h1'-0" x 11'-6" with reinforced preoast
panels and columns, assembled with bolts and welded steel plated, anohored to a
reinforoed foundation and footings 3'-6" thick below grade.
_
|
1
each
Direst
Indirect
I
Inetrumentation
|
Dir eot
Indir ect
Total Structure and Instrumentation
Direct
Indirect
|
$14,587.59
begn.co
5,ees
4,
20,472.75
12,749.12
-O-
$21,282 .68
$2,321 47
14,260 .66
2,321 24,7
35543.34
-0O-
32,565.91
1,773.79
9,729.93
1,773.75
42,295.68)
BUILD ING 3.2.2
.
;
1
A concrete and brick test structure, sise 211-6" x 3'-6" = 11'-0", with
reinforoed precast concrete panels bolted to brick walls and a flat wood frans
roof, anchored to reinforced foundation and footings 3'-0" below grade,
|
1
each
Direct
Indireot
|
Ingtrumentation
fotel Structure and Instrumentation
21, 767 2
10,798 49
Direct
3,966.33
Direot
25, 733675
Indi re ot
Indirect
3,989.85
14,788.34
to
a
tnits